|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2017-00429
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2017
>
DCPZP-2017-00429
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2017 11:01:16 AM
Creation date
7/14/2017 11:01:07 AM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2017-00429
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DANE G (> UN ' Y REGIONAL. AIRPORT <br /> 6,:) -'?t, ■ 1 ?f°.e Rfi 6(,S • 24as - 332sc) A<, Lei?; • 338' msn irport.corn <br /> July 13, 2017 � . <br /> Scott Schroeckenthaler D A N E <br /> Zoning Inspector COUNTY <br /> Dane County Zoning Division REGIONAL <br /> A I R P O R T <br /> 210 Martin Luther King Jr. Blvd. PA A D I S O N <br /> Department of Planning and Development <br /> Room 116, City-County Building <br /> Madison, WI 53703-3342 <br /> Re: Permit Application under §78.06 Dane County Ordinance <br /> Crane RT <br /> N43-08-09.30 NAD 83 W89-21-30.57 <br /> Dear Mr. Schroeckenthaler: <br /> Below are the conditions the Airport requests the Zoning Administrator establish <br /> for issuance of the permit. <br /> CONDITIONS APPLICABLE TO CRANE LINK BELT PERMIT: <br /> (1) Applicant shall comply with all conditions and recommendations set forth in <br /> the Determination Letter regarding Federal Aviation Administration Aeronautical <br /> Study No. 2017-AGL-10194-OE. <br /> (2) Prior to erecting the construction crane, applicant shall provide the on duty <br /> Airport Operations Supervisor, Dane County Regional Airport (office: <br /> 608.246.3397, cell: 608.235.1001), with the name and telephone number of an <br /> individual(s) having authority over operation and placement of the crane while it <br /> is on the construction site and, upon request, shall arrange a meeting between <br /> Airport staff and the contractor that will be operating the crane. <br /> (3) Applicant shall, at least three days before the crane height will reach 1,095 <br /> feet MSL, provide notice to Airport Operations. <br /> (4) At all times the highest point of the crane shall be marked during daylight <br /> hours with an orange and white checkered construction flag measuring at least <br /> three feet by three feet, and with a red obstruction light, with a minimum intensity <br /> of 32.5 candela, from two hours before sunset until two hours after sunrise and <br /> during periods of reduced visibility. <br /> (5) Neither the construction crane nor any equipment or other items attached to, <br /> or used to erect the crane, except the above described flag and light, shall at any <br /> time exceed a height of 1,095 feet MSL. <br />
The URL can be used to link to this page
Your browser does not support the video tag.