Laserfiche WebLink
Dane County Water Resource Engineering Division <br /> DINAP - "Do I NEED A PERMIT" <br /> General Information: <br /> Date of Contact: 12/1/2016 <br /> Caller/Contact: Todd Barsness Phone#: (608) 444-2054 <br /> Landowner: The Heffron Company Inc Phone#: <br /> Contact Email: tvbarsness @yahoo.com <br /> Project Address: Linsley Lane <br /> Location(Municipality): Tn. Roxbury Section: 18 '/: <br /> Parcel#: 0907-184-4617-0 <br /> Project Description: Prospective buyer would like to build SFR on lot <br /> Planned Size of Disturbance: ? ft2 Planned Size of New Impervious: ? ft2 <br /> Water Resource Engineering Division Response: <br /> Based On Information Above the Project:❑DOES* IN DOES NOT Require a Permit <br /> Determination Made by: ❑JAN ❑JDB FA JAS ❑JAH ❑JRT ❑AJM EJRR <br /> Type of Permit Required: ❑Erosion Control Shoreland Erosion Control ❑Stormwater Management <br /> ❑Disturbance >4000 ft2 ❑ Excavate/Fill>400 yds3 ❑ Disturbing 100' of ditch/channel <br /> ❑ 125'Long new access road/driveway❑ Subdivision Plat/CSM ❑ 20,000 ft2 New Impervious areas <br /> ❑Shoreland Zone Disturbance ❑ Other: <br /> Basis for Determination: Driveway >125' not feasible, no way to disturb > 1 acre soil. <br /> EC Permit not required. No shoreland zone on the lot. <br /> Permit determination is based upon the information provided by caller/landowner on the date of contact. <br /> Changes in project size, scope or location may trigger changes to permit requirements. <br /> It is the responsibility of the owner to ensure all required permits have been obtained prior to commencing work. <br />