|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2017-00453
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2017
>
DCPZP-2017-00453
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2017 1:05:54 PM
Creation date
8/1/2017 1:05:37 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2017-00453
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A location survey, by a licensed surveyor, is required if your construction <br /> is within 10 feet of a setback line. <br /> • You will need to hire a surveyor to prepare a location survey to verify the construction location. <br /> • The survey shall be done at the time when foundations or basement walls are completed. <br /> • A location survey shall be submitted to the zoning office before continuing work on the project. <br /> • Note: A location survey may add significant cost to your project. Please contact a Wisconsin Licensed Land Surveyor. <br /> you may need this if . . . <br /> 33' 33' I I <br /> I I <br /> Front Setback area S 72°57' 40" E 254.01' r--Side Setback area <br /> • _ 11�J� • Rear <br /> O j ,,/-Z/Z /iii��iii��iii�iii%iii/��� 1 Setback <br /> ���������///// area <br /> O O <br /> 71 Feet I— <br /> O Needs a W co <br /> !!!!!!!! Location / <br /> W <br /> Q w U Survey Ø+._Setback 169.8' 7 is <br /> 0 %� N N <br /> � i co <br /> r <br /> 1 Z _ _ _ �/ ///// 03 <br /> • N 72°57' 40" W • <br /> ISide Setback area <br /> 33' 33' I I <br /> I <br /> 1. I, the undersigned, hereby make application for a zoning permit only for the location and the work described herein and <br /> certify to the accuracy of that information. I further certify I am the property owner, or a duly authorized representative, <br /> and may sign this permit application on behalf of the owner(s)of said property, and I have read and understand all of <br /> the conditions of this permit and will construct the project in compliance with those conditions. I understand that failure <br /> to provide accurate information or to comply with any provisions of the permit renders it null and void and may result in an <br /> enforcement action. <br /> 2. I,the undersigned, hereby consent to the entry on the permitted premises by zoning inspectors of the Dane County <br /> Department of Planning & Development to determine compliance with the county's zoning ordinances.This consent is <br /> valid for the period commencing with issuance of this zoning permit and terminating with issuance of a certificate of <br /> compliance or until earlier revoked in writing by the owner of the property. <br /> PRINT: Owner/Agent DATE: <br /> ' . iX eei a /-'/I 94te- u;‘ 2Y/'Z°/? <br /> SIGNATURE: Owner/Agent <br />
The URL can be used to link to this page
Your browser does not support the video tag.