|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2017-00482
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2017
>
DCPZP-2017-00482
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2017 1:17:47 PM
Creation date
8/8/2017 1:17:44 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2017-00482
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
/`■ <br /> DAN E <br /> COUNTY August 4, 2017 <br /> REGIONAL <br /> AIRPORT <br /> MADISON Scott Schroeckenthaler <br /> Zoning Inspector <br /> Dane County Zoning Division <br /> 210 Martin Luther King Jr. Blvd. <br /> Department of Planning and Development <br /> Room 116, City-County Building <br /> Madison, WI 53703-3342 <br /> Re: Permit Application under §78.06 Dane County Ordinance <br /> Crane Mad College <br /> N43-07-16.00 W89-19-42.90 <br /> Dear Mr. Schroeckenthaler: <br /> Below are the conditions the Airport requests the Zoning Administrator establish <br /> for issuance of the permit. <br /> CONDITIONS APPLICABLE TO CRANE MAD COLLEGE PERMIT: <br /> (1) Applicant shall comply with all conditions and recommendations set forth in <br /> the Determination Letter regarding Federal Aviation Administration Aeronautical <br /> Study No. 2017-AGL-8442-OE. <br /> (2) Prior to erecting the construction crane, applicant shall provide the on duty <br /> Airport Operations Supervisor, Dane County Regional Airport (cell: 608-235-1001 <br /> or office: 608.246.3397), with the name and telephone number of an individual(s) <br /> having authority over operation and placement of the crane while it is on the <br /> construction site and, upon request, shall arrange a meeting between Airport <br /> staff and the contractor that will be operating the crane. <br /> (3) Applicant shall, at least three days before the crane height will reach 986 feet <br /> MSL, provide notice to Airport Operations. <br /> (4) At all times the highest point of the crane shall be marked during daylight <br /> hours with an orange and white checkered construction flag measuring at least <br /> three feet by three feet, and with a red obstruction light, with a minimum intensity <br /> of 32.5 candela, from two hours before sunset until two hours after sunrise and <br /> during periods of reduced visibility. <br /> 4000 international Lane I Madison, WI 53704 I (608) 246 - 3380 1 msnairport.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.