Laserfiche WebLink
6/15/2017 <br /> C L AMY V P.0 ax W 930220 <br /> 53593 0220 Doc ID:776982017061151455748 <br /> BUILDING CORP. Phone:(608)845-9700 <br /> ClearyBuilding.coni Fax:(608)845-7070 Cleary/Owner Project Contract - Erected <br /> Truss Type <br /> Note:Clearance may be reduced by finished floor height. <br /> Roof Pitch: 4/12 <br /> Roof Peak Height: 15'4" <br /> `4 "A" = Actual Eave Height: 11'4'. <br /> 0 ' "B" =Truss clearance at heel: 10'0" <br /> (Truss clearance = 1'-0" less than nominal eave height,in most cases. <br /> 4,100'+0° If nested purlins are used truss clearance will be increased by 4".) <br /> Raised Lower Chord Truss(RLC) "C" =Truss clearance at center: 11'0" <br /> (Truss clearance at the center of the bulding with an RLC truss will be <br /> greater than the clearance at the heel.) See page PL-6 in the price <br /> book for clearances. <br /> Overhead Frameout & Headroom <br /> "D" = Bottom elevation(B.E.)of overhead door: 0'4" <br /> The bottom of all overhead doors(top of finished floor)are <br /> recommended to be placed at 4"above the 100'-0" mark(100'-4"). In <br /> building without paved floors, B.E.of doors may be lower-e.g. 100'- <br /> 0". <br /> j "E" = Height of overhead door: 8'0" <br /> Overhead door height = the height of the overhead door being placed <br /> in this building. <br /> "F" = Available headroom: 1'9" <br /> Available headroom = the space available for overhead door tracks <br /> and openers. If a ceiling is installed,headroom will be reduced by <br /> about 1". Door headroom requirements must be confirmed with the <br /> door supplier. <br /> r a. Headroom calculation formula: <br /> r <br /> („B„)- („D") - („E„) = ("F”) <br /> (Truss Clearance) - (B.E.of overhead door)-(Overhead door height) = <br /> (Available headroom) <br /> Example: <br /> (10'-0") - (4") - (8'-0") = (1'-8"of available headroom) <br /> v12/0 built with pride before the n is applied R 16 of 22 <br />