|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2008-00238/239
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2000s
>
2008
>
DCPZP-2008-00238/239
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2017 4:13:38 PM
Creation date
8/17/2017 4:13:22 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2008-00238
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
a 6ta';; <br /> `'ivo ° 4 ; Dane County Planning & Development <br /> ► - Zoning Division <br /> ZONING PERMIT INSPECTION REQUIREMENTS <br /> The Dane County Zoning Ordinance provides that two inspections shall be made by the Zoning <br /> Division. Instructions are as follows: - <br /> 1. The permit card shall be posted on the premises before any earth disturbing activity is <br /> started. <br /> 2. The owner or agent shall have all lot corners visibly staked prior to requesting an inspection. <br /> The Zoning Inspector shall not be responsible for determining the location of lot lines. Please <br /> be advised that zoning inspections are made in reliance upon your correct identification of <br /> property boundaries and lot lines. <br /> 1RS, tI SP-C-l°t�; <br /> a. Is a location survey required? Yes No <br /> If yes, a first inspection phone call req est is not required. Please arrange to have a <br /> copy of the survey delivered to our department prior to any construction above the <br /> foundation. <br /> h br t r.;If no, the owner or agent shall request the first inspection when the foundation or <br /> basement walls have been constructed. Footings only are not considered a <br /> foundation. The locational extent of the permitted structure must be identifiable at <br /> the time of the first inspection. Construction may continue only after an inspection <br /> has been requested. <br /> 1C 4 S CQ ID I($PM i 14 Shall be requested when the building is substantially completed. <br /> Interior trim, carpeting, painting, etc., do not have to be finished prior to the inspection but, <br /> interior walls must be in place and the electrical, plumbing and heating services must be <br /> installed and operating. <br /> 5. CE tilC,A` &OZ:$6MP'L A,:GE: The zoning inspections are made to verify compliance <br /> with the regulations of. .nin• ordinance. The Zoning Division, upon completion of both <br /> inspections will is - - e rficate o • ••.-•ce. <br /> To schedule a nspection 4«-j : 06"-"426Noriday throug Friday, 8:00 AM -4:00 PM. You will be given an <br /> inspection re• est number, V Cti WiII serve as a verification •f your call. <br /> A iLl[CGT. <br /> Permit mber, i-7 ,mw * , f �5.- <br /> IMPORTANT: The two inspections required by the Zoning Ordinance can only be made by the Zoning <br /> Department <br /> S EA c., Pr 4 i r- (C._ <br /> N PERMITS: For information regarding Town permits, contact <br /> Town / <br /> C11 , 6 Is.0 C. k� at PO� " q 2 - 5-2 - � <br /> Building Inspector/Clerk Phone Number <br />
The URL can be used to link to this page
Your browser does not support the video tag.