Laserfiche WebLink
ARY <br /> 8/15/2017 <br /> JACKSON,MRK <br /> oBnoax <br /> na,WI 53593-0220 Doc ID:3883820170815121147 <br /> BUILDING CORP. Phone:(608)845-9700 <br /> ClearyBuilding.com Fax:(608)845-7070 Cleary/Owner Project Contract - Erected <br /> Truss Type <br /> _ <br /> r <br /> 41 <br /> Note:Clearance may be reduced by finished floor height. <br /> Roof Pitch: 3/12 <br /> Roof Peak Height: 15'4" <br /> "A" =Actual Eave Height 12'4" <br /> U Q "B" =Truss clearance at heel: 11'0" <br /> CO (Truss clearance= 1-0" less than nominal eave height,in most cases. <br /> gib <br /> 1pp'+p" If nested purlins are used,truss clearance will be increased by 4".) <br /> Raised Lower Chord Truss (RLC) "C" =Truss clearance at center. 12'0" <br /> (Truss clearance at the center of the bulding with an RLC truss will be <br /> greater than the clearance at the heel.) See page PL-6 in the price <br /> book for clearances. <br /> Overhead Frameout & Headroom <br /> "D" = Bottom elevation(B.E)of overhead door. 0'4" <br /> The bottom of all overhead doors(top of finished floor)are <br /> recommended to be placed at 4"above the 100'-0"mark(100'-4"). In <br /> building without paved floors,B.E.of doors may be lower-e.g. 100'- <br /> 0". <br /> "E" = Height of overhead door. 10'0" <br /> i Overhead door height =the height of the overhead door being placed <br /> in this building. <br /> "F" = Available headroom: 1'2" <br /> Available headroom =the space available for overhead door tracks <br /> and openers. If a ceiling is installed,headroom will be reduced by <br /> about 1". Door headroom requirements must be confirmed with the <br /> door supplier. <br /> . I _ Headroom calculation formula: <br /> .1. ("B")-("D")-("E") = ("F") <br /> . (Truss Clearance)-(B.E.of overhead door)-(Overhead door height) = <br /> (Available headroom) <br /> Example: <br /> (10'-0")-(4")-(8'-0°) = (1'-8"of available headroom) <br /> ;2;0 built with pride before the # is applied ® 10 of 16 <br />