Laserfiche WebLink
A location survey, by a licensed surveyor, is required if your construction <br /> is within 10 feet of a setback line. <br /> • You will need to hire a surveyor to prepare a location survey to verify the construction location. <br /> • The survey shall be done at the time when foundations or basement walls are completed. <br /> • A location survey shall be submitted to the zoning office before continuing work on the project. <br /> • Note: A location survey may add significant cost to your project. Please contact a Wisconsin Licensed Land Surveyor. <br /> you may need this if . . . <br /> 33' 33' I <br /> Front Setback area S 72°57' 40" E 254.01' --Side Setback area <br /> • <br /> 1 _ 1� Rear <br /> D Z/ /////�i%%%iii��/%%/ii%/ii% 1 Setback <br /> area <br /> O j ! O <br /> O ���% <br /> r <br /> co Needs a 10 Feet / w <br /> ....a.■■ Location W <br /> Q w w TZ <br /> Survey � Setback w <br /> 169.8' / Line } <br /> 0 O / Proposed %� ~ CO <br /> CC N O Addition n O <br /> c35. %j iv N CO <br /> CO <br /> z I� cn <br /> #■&J .J A <br /> _ _ _ <br /> M <br /> 1 <br /> 1 <br /> 1 • ro <br /> 1 Side Setback area N 72°57' 40" W <br /> I <br /> 33' 33' I <br /> I <br /> 1. I, the undersigned, hereby make application for a zoning permit only for the location and the work described herein and <br /> certify to the accuracy of that information. I further certify I am the property owner, or a duly authorized representative, <br /> and may sign this permit application on behalf of the owner(s)of said property, and I have read and understand all of <br /> the conditions of this permit and will construct the project in compliance with those conditions. I understand that failure <br /> to provide accurate information or to comply with any provisions of the permit renders it null and void and may result in an <br /> enforcement action. <br /> 2. I,the undersigned, hereby consent to the entry on the permitted premises by zoning inspectors of the Dane County <br /> Department of Planning & Development to determine compliance with the county's zoning ordinances.This consent is <br /> valid for the period commencing with issuance of this zoning permit and terminating with issuance of a certificate of <br /> compliance or until earlier revoked in writing by the owner of the property. <br /> PRINT: Owner/Agent DATE: <br /> E ' r&lv,v-C'', S- 5" 7 - a0l7 <br /> SIGNATURE: Owner/A ent <br /> lir . <br />