Laserfiche WebLink
8/6/2017 <br /> I RETTENMUND DITCH PROJECT <br /> WHY <br /> We have rented the land for over 20 years and there was no maintenance done to the ditches. In 2014,we had <br /> beavers that blocked the ditch right before it enters the Black Earth Creek.The dam was removed by hand,but <br /> the sediment from the stagnant water flooded all the land up to county road KP. Sediments have, overtime, <br /> filled the ditches in. <br /> WHAT <br /> We would like to clean the sediments out of the ditches that are highlighted in red. The Blue indicated where <br /> the existing drive-through is to the 40-acre field.The Yellow,where less water flows, is where I would like to <br /> propose to put a large culvert so I will not have to drive tractors and fertilizer/planting equipment through the <br /> water. <br /> WHEN <br /> Once crops are removed and weather is permitting this fall (2017). <br /> CONTACT INFORMATION <br /> Mark Rettenmund <br /> Cell: (608) 577-7272 <br /> Email: markretfarms @gmail.com <br /> MAP <br /> See Page 2. <br />