|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPFLO-2017-00012
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2017
>
DCPFLO-2017-00012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2017 12:12:20 PM
Creation date
9/22/2017 12:12:17 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPFLO-2017-00012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8/6/2017 <br /> I RETTENMUND DITCH PROJECT <br /> WHY <br /> We have rented the land for over 20 years and there was no maintenance done to the ditches. In 2014,we had <br /> beavers that blocked the ditch right before it enters the Black Earth Creek.The dam was removed by hand,but <br /> the sediment from the stagnant water flooded all the land up to county road KP. Sediments have, overtime, <br /> filled the ditches in. <br /> WHAT <br /> We would like to clean the sediments out of the ditches that are highlighted in red. The Blue indicated where <br /> the existing drive-through is to the 40-acre field.The Yellow,where less water flows, is where I would like to <br /> propose to put a large culvert so I will not have to drive tractors and fertilizer/planting equipment through the <br /> water. <br /> WHEN <br /> Once crops are removed and weather is permitting this fall (2017). <br /> CONTACT INFORMATION <br /> Mark Rettenmund <br /> Cell: (608) 577-7272 <br /> Email: markretfarms @gmail.com <br /> MAP <br /> See Page 2. <br />
The URL can be used to link to this page
Your browser does not support the video tag.