|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPFLO-2017-00013
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2017
>
DCPFLO-2017-00013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2017 4:08:53 PM
Creation date
10/13/2017 3:13:54 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPFLO-2017-00013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
J i" DANE COUNTY Zoning Division <br /> `'',�► ,�h PLANNING DEVELOPMENT Room 116, City-County Building <br /> '�� 210 Martin Luther King Jr. Blvd. <br /> Madison,Wisconsin 53703-3342 <br /> Phone: 08026 4266 Flood lain Development Application Fax: (608) 267-1540 <br /> i Items required to be submitted with application: <br /> o Site Development Plans <br /> Plans shall include scaled drawings of existing topography of the area and proposed final grades of <br /> development. All topographical information shall be in NAVD 1988 and be referenced to a known <br /> benchmark. The plan shall show all existing and proposed building footprints and elevations of lowest <br /> floor elevations. The plans shall include dimensions of ditches,culverts,or other structures existing or <br /> proposed. All plans shall be stamped and signed by a professional engineer or architect. <br /> o Engineering Analysis <br /> The analysis shall include calculations or modeling that shows that the development will not obstruct <br /> flow or will not increase the floodwater elevation 0.01 of a foot or more.All calculations shall be <br /> stamped and signed by a professional engineer or architect. <br /> Owners NameAlliant Energy - Dana Halverson Contractors Name Eilertson Inc. <br /> Address 4902 N Biltmore Street, Address PO Box 1025, <br /> Phone Madison WI 53718 Fond du Lac WI 54936-1025 <br /> Phone <br /> (608) 458-3495 (920) 921-8982 <br /> Email danahalverson @alliantenergy.com Email <br /> Parcel numbers affected: 050810105016, 050810180453Town: Montrose Section:10 <br /> 050810180020,050810180300, and road ROW property Address:Within Road ROW and an <br /> easement along Paoli Rd. <br /> FEMA Panel Map:55025C0567G Floodplain District:Dane County Flood Elevation: 898 -89 Ft <br /> Scope of work: (Describe development in detail) Alliant Energy is planning to install <br /> approximately 400 linear feet of underground electric line, install 3 new <br /> overhead electric poles, and remove one overhead electric pole along Paoli <br /> Road in the Town of Montrose, Dane County as part of an electric relocation <br /> project. <br /> I authorize that I am owner or have permission t ad on behalf of the owner of the property. 10/10/2017 <br /> Submitted By: µ ¢ Date: <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.