|
Help
|
About
|
Sign Out
Home
Browse
Search
TIE 40612300000 (5)
DaneCounty-Planning
>
Tie Sheets
>
SCANNED & INDEXED
>
TIE SHEETS
>
TIE 40612300000 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2018 1:03:35 PM
Creation date
11/29/2017 3:14:45 PM
Metadata
Fields
Template:
Planning Records
Document_Type
Tie Sheets
Name
TIE 40612300000
Township_Number
06
Range
12
Section
30
Surveyor's_Name
RIESOP, DAVID
Corner_Number
40612300000
Date
5/9/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(e)Describe any material discrepancy between the location of the corner as restored or reestablished and the location of that <br /> corner as previously restored or reestablished by distance and direction. Show the discrepancy in the sketch on sheet 1. <br /> None <br /> (1) Was the corner restored through acceptance of(1)an obliterated evidence location,or(2)a found perpetuated location? <br /> (2)a found perpetuated location <br /> (g&h)Was the corner reestablished through proportionate methods? If so,show the method, including the directions and <br /> distances to other public land survey corners used as evidence or used for proportioning in determining the corner location? <br /> Not Applicable. <br /> (i)List all previous Monument Records found,previously filed for the subject corner, including monument types set or found, <br /> surveyor,and date of survey. <br /> June 3, 1902- W.L. Marcy set stone monument for resurvey of Christiana township. <br /> May 10, 1964-Unsigned tie sheet shows corner and references Railroad spike at intersection of C.T.H. "W" <br /> and East Chrurch Road. <br /> March 21, 1978-Glen L.Northrop found the 5" square sandstone monument in steep cut bank leaning <br /> south,straightened the monument and set reference ties. <br /> August 3, 1978-J. Michael Clayton found a the square monument which agreed with previous tie sheet <br /> dated 3/21/1978. <br /> November 20, 1984-Glen L.Northrop found the square sandstone monument lying on its side on steep cut <br /> bank, he found the old hole where stone came out of agreeing with tie distances from pipes on tie <br /> sheet dated Aug. 3, 1978. The stone was placed back in old hole and concrete poured around stone. <br /> (j)I,David C. Riesop,Professional Land Surveyor number S-1551 hereby certify that the corner location shown on this record <br /> was determined by me or under my direction and is correct. This U.S. Public Land Survey Monument Record is complete to the <br /> best of m owledge and belief. <br /> C, 05/09/2017 <br /> David Riesop Date <br /> Professional Land Surveyor Number S-1551 <br /> Affix Land Surveyor Seal <br /> SCONS�ti <br /> * DAVID C. <br /> RIESOP <br /> S-1551 <br /> DEERFIELD <br /> WISCONSIN <br /> VO SURV� <br /> CORNER IDENTIFICATION NUMBER •40612300000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.