|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2017-00780
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2017
>
DCPZP-2017-00780
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2017 3:00:55 PM
Creation date
12/6/2017 12:37:26 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2017-00780
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
11/7/2017 Mail-ccronin @jnbsigns.com <br /> Road Star Inn sign <br /> Ernst, Matthew <mernst @atcllc.com> <br /> Thu 11/2/2017 1:55 PM <br /> Deleted Items <br /> To:C Cronin <ccronin @jnbsigns.com>; <br /> cc:Ernst, Matthew <mernst @atclic.com>; <br /> Chris, <br /> The sign is approved via the provisions below. <br /> These must be kept in place and utilized to remain in accordance with this approval. <br /> Please review with your client and when agreed upon..please provide me with a name,Title and mailing address of a person <br /> authorized to sign for the sign agreement. <br /> I will then draft up an agreement document and get to them, for signatures and I will keep you in the loop to the end... <br /> Thanks. <br /> The proposed sign near line W-11 between structures 121968 and 121969 is approved. <br /> The guidelines below must be followed when performing work around ATC facilities. <br /> 1. Maintain a safe working clearance to the 345 kV conductors at all times based on the latest OSHA requirements. <br /> 2.The costs associated with any outage request associated with concerns over OSHA clearance will be the responsibility <br /> of the requestor pending engineering review and approval by the ATC outage coordinator and MISO,the regional grid <br /> operation authority. <br /> 3. Unobstructed ATC access to the transmission lines and structures must be maintained at all times. <br /> 4. No stockpiling or staging of equipment/materials under or near the ATC transmission lines and structures. <br /> 5.ATC does not allow grade changes of more than one foot within the easement unless review of specific plans proves <br /> that the changes will not impact our line clearances or access. If the developer plans on altering the grade as shown <br /> in the plans by more than one foot, revised plans must be submitted clearly showing all grade changes before <br /> approval can be granted. <br /> 6. Any damage to the ATC facilities must be reported immediately. <br /> 7. Transmission structures may have multiple ground rods.These ground rods could be located a significant distance <br /> from the structure. All ground rods are connected to the structure via a ground wire and could be buried to a depth <br /> of eighteen (18) inches or deeper. If the ground rods are disturbed through construction activities,the location must <br /> be noted and promptly reported to ATC's Maintenance Department. <br /> 8. Electric fields under 345 kV transmission lines can cause induced voltages on ungrounded equipment and vehicles <br /> that are under the transmission line. This can be uncomfortable to persons who come in contact with such <br /> equipment. The contractor is responsible for installing any grounding necessary on their equipment to minimize this <br /> issue. <br /> Matt Ernst <br /> Sr. Real Estate Representative <br /> P.O. Box 6113 <br /> [)e Pere, WI 54115 <br /> 920-338-6573 <br /> https://outlook.office.com/owa/?realm=jnbsigns.com&exsvurl=1&II-cc=1033&modurl=0&path=/mail/search 1/1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.