|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2017-00574
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2017
>
DCPZP-2017-00574
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2017 3:47:07 PM
Creation date
12/6/2017 3:33:33 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2017-00574
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docket 9170-RX-343 <br /> will encounter a grade crossing soon after making a turn. Sign W10-3 is required because USH <br /> 14 runs parallel to the WSOR tracks less than 100 feet away.- Advanced warning sign W10-1 is <br /> not required between USH 14 and the tracks. <br /> Order <br /> 1. The WSOR shall install and maintain a reconstructed crossing at-grade of <br /> Schwartz Road with the WSOR tracks in accordance with its design plans in the town of <br /> Middleton by September 1,2017. <br /> 2. The WSOR shall install and maintain crossbucks at a height of nine feet above <br /> the roadway with sign R1-1 STOP on the north approach, and sign R1-2 YIELD on the south <br /> approach to the Schwartz Road crossing, installed below the crossbucks and on the same posts, <br /> by September 1,2017. <br /> 3. The WSOR may reuse any signal equipment that is in working condition. <br /> 4. The WisDOT shall install and maintain advance warning signs W10-3 on USH <br /> 14 at a distance from the crossing in accordance with the Manual on Uniform Traffic Control <br /> Devices(MUTCD)on each approach by September 1,2017. <br /> 5. The town of Middleton shall clear brush and trim trees within its highway right- <br /> of-way for 330 feet down the highway in each direction from the Schwartz Road crossing by <br /> September 1,2017. <br /> 6. The WSOR shall clear brush and trees from its right-of-way for 330 feet down <br /> the tracks in each direction from the Schwartz Road crossing by September 1,2017. <br /> 7. The WSOR shall initiate and process an updated U.S. DOT Crossing Inventory <br /> Form FRA F 6180.71 no later than 45 days after finishing construction. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.