|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2017-00772
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2017
>
DCPZP-2017-00772
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2017 10:44:02 AM
Creation date
12/8/2017 9:05:27 AM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2017-00772
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• • Public Health Janel Heinrich, MPH, MA, Director <br /> MADISON & DANE COUNTY Environmental Health Division <br /> Healthy people. Healthy places. 2300 S Park St, Suite 2010 (608)242-6515 Phone <br /> Madison,WI 53713 (608)267-1989 Animal Control-Voicemail <br /> www.publichealthmdc.com (608)242-6435 fax <br /> November 14, 2017 PlanReview ID: 13-2017-00386 <br /> STEVE R CROSBY <br /> SEPTIC SPECIALISTS EXCAVATING, INC. <br /> 7361 DARLIN DRIVE <br /> DANE, WI 53529- <br /> Reference: Tax Parcel Number: 0911-302-0507-0 <br /> NE 1/4 of NW 1/4 of Section 30, Town of Bristol <br /> Subdivision: HAPPY VALLEY ADDN TO BRISTOL GARDENS Lot: 27 <br /> Property Address: <br /> Owner Name: Happy Valley Addition Llc <br /> Conditional approval for 600 gdp split cell mound >24" granted. <br /> Plan approval expires November 14, 2019. <br /> Dear Steve R Crosby: <br /> The submittal described above has been reviewed for conformance with applicable Wisconsin <br /> Administrative Codes, Wisconsin Statute and Dane County code ch. 46. The submittal has been <br /> CONDITIONALLY APPROVED. The owner, as defined in chapter 101.01 (10), Wisconsin Statutes, is <br /> responsible for compliance with all code requirements. <br /> The following conditions shall be met during construction or installation and prior to occupancy or use: <br /> New split cell mound with 6" sand, 0.6 loading rate, 600 gpd <br /> This system is to be constructed and located in accordance with the enclosed approved plans and <br /> with the following manuals: <br /> Mound Component Manual Version 2.0 SBD-10691-P(N.01/01), Pressure Distribution <br /> Component Manual - Version 2.0, SBD-10706-P (N.01/01) . <br /> In the event this soil absorption system or any of its component parts malfunctions so as to create <br /> a health hazard, the property owner must follow the contingency plan as described in the <br /> approved plans. In addition, the owner must comply with the operation, maintenance and <br /> monitoring duties as described in section VIII of the component manual. A copy of this information <br /> must be given to the owner upon completion of the project <br /> A Sanitary Permit must be obtained from Public Health Madison and Dane County where this <br /> project is located. <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.