|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2018-00003
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2018
>
DCPZP-2018-00003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2018 1:55:38 PM
Creation date
1/4/2018 3:35:46 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2018-00003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Additional Condition(s) or Information for ASN 2017-AGL-19784-OE <br /> Proposal: To construct and/or operate a(n) Holy Cross Crane at NE Bldg Corner to a height of 80 feet above <br /> ground level, 1095 feet above mean sea level. <br /> Location: The structure will be located 2.85 to 2.89 nautical miles southeast of MSN Airport reference point. <br /> Part 77 Obstruction Standard(s) Exceeded and Aeronautical Impacts, if any: <br /> Aeronautical study revealed that the temporary structure will not exceed any Part 77 obstruction standard. <br /> Aeronautical study confirmed that the temporary structure will have no effect on any existing or proposed <br /> arrival, departure or en route instrument/visual flight rules (IFRIVFR) operations or procedures. Additionally, <br /> aeronautical study confirmed that the temporary structure will have no physical or electromagnetic effect on the <br /> operation of air navigation and communications facilities and will not impact any airspace and routes used by <br /> the military. Based on this aeronautical study, the FAA finds that the temporary structure will have no adverse <br /> effect on air navigation and will not impact any aeronautical operations or procedures. <br /> Based on this aeronautical study, the structure would not constitute a substantial adverse effect on aeronautical <br /> operations or procedures because it will be temporary. The temporary structure would not be considered a <br /> hazard to air navigation provided all of the conditions specified in this determination are strictly met. <br /> Based on this evaluation, marking and lighting are not necessary for aviation safety. However, if marking/ <br /> lighting are accomplished on a voluntary basis, we recommend it be installed in accordance with FAA Advisory <br /> circular 70/7460-1 L Change 1. <br /> It is required that the manager of DANE COUNTY RGNL-TRUAX FIELD, (608)246-3380 be notified at least <br /> 3 business days prior to the temporary structure being erected and again when the structure is removed from the <br /> site. <br /> It is required that the manager of MSN Airport Traffic Control Tower at 608-244-5691 be notified at least 3 <br /> business days prior to the temporary structure being erected and again when the structure is removed from <br /> the site. Additionally, please provide contact information for the onsite operator in the event that Air Traffic <br /> Control requires the temporary structure to be lowered immediately. <br /> This determination expires on 05/16/2019 unless extended, revised, or terminated by the issuing office. <br /> NOTE: REQUEST FOR EXTENSION OF THE EFFECTIVE PERIOD OF THIS DETERMINATION MUST <br /> BE E-FILED AT LEAST 15 DAYS PRIOR TO THE EXPIRATION DATE. AFTER RE-EVALUATION <br /> OF CURRENT OPERATIONS IN THE AREA OF THE STRUCTURE TO DETERMINE THAT NO <br /> SIGNIFICANT AERONAUTICAL CHANGES HAVE OCCURRED, YOUR DETERMINATION MAY BE <br /> ELIGIBLE FOR ONE EXTENSION OF THE EFFECTIVE PERIOD. <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.