|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2018-00005
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2018
>
DCPZP-2018-00005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2018 1:55:19 PM
Creation date
1/5/2018 4:18:49 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2018-00005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
11/24/2017 <br /> CL ARY oBnoax <br /> WI 93052325093_0220 Doc ID:8 65 201071124113439 <br /> BUILDING CORP. Phone:(608)845-9700 <br /> ClearyBuilding.com Fax:(608)845-7070 Cleary/Owner Project Contract - Erected <br /> Truss Type <br /> Note:Clearance may be reduced by finished floor height. <br /> Roof Pitch: 4/12 <br /> Roof Peak Height 25'10" <br /> "A" =Actual Eave Height: 20'10" <br /> Q m to "B" =Truss clearance at heel and center: 19'6" <br /> (Truss clearance= 1'-0"less than nominal eave height,in most cases. <br /> 116.100.+0" If nested purlins are used,truss clearance will be increased by 4".) <br /> Standard Lower Chord Truss (SLC) <br /> Overhead Frameout & Headroom <br /> "D" = Bottom elevation(B.E.)of overhead door: 0'0" <br /> The bottom of all overhead doors(top of finished floor)are <br /> recommended to be placed at 4"above the 100'-0" mark(100'-4"). In <br /> building without paved floors, B.E.of doors m4 be lower-e.g.100'- <br /> 0". <br /> "E" = Height of overhead door: 8'0" <br /> -J _ Overhead door height=the height of the overhead door being placed <br /> in this building. <br /> "F" = Available headroom: 11' 5" <br /> Available headroom =the space available for overhead door tracks <br /> and openers. If a ceiling is installed,headroom will be reduced by <br /> about 1". Door headroom requirements must be confirmed with the <br /> door supplier. <br /> r — Headroom calculation formula: <br /> r <br /> ("B")-("D")-("E")= ("F") <br /> . (Truss Clearance)-(B.E.of overhead door)-(Overhead door height) = <br /> (Available headroom) <br /> Example: <br /> (10'-0")-(4")-(8'-0") = (1'-8"of available headroom) <br /> 20 built with pride before the i0' is applied R 19 of 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.