Laserfiche WebLink
• <br /> 12/26/2017 <br /> CL ARY HANNA,4258 <br /> TRAVIS LEESER Doc ID:5129820171NNA, 258 <br /> BUILDING CORP. Cell Phone:(608)379-0132 <br /> Phone Number: (608)845-9700 <br /> ClearyBuilding.com <br /> Email:TLeeser @clearybuilding.com <br /> Cleary Buildings Project Estimate <br /> Client Proposal - Erected <br /> Project Name:+11141061fillilike <br /> Site Addressimiiiii9eN,WISCONSIN 53714 <br /> Email: michael <br /> Cell Phone <br /> i <br /> Commercial 30' 0"x130' 0"x13' 4" with 12' 0" truss clearance from 100'-0" mark. (17 Bays at 8' o.c.) <br /> Details: <br /> Truss(Standard Lower Chord)with 3/12 roof pitch. <br /> Custom Bays for: Building 1 <br /> Bays 01-07: 8' 0" Ceiling: Designed to Support a Steel Ceiling Roof System:Truss(Standard Lower Chord) <br /> Bays 08-10: 6' 0" Ceiling: Designed to Support a Steel Ceiling Roof System:Truss(Standard Lower Chord) <br /> Bays 11-17:8' 0" Ceiling: Designed to Support a Steel Ceiling Roof System:Truss(Standard Lower Chord) <br /> Default Ceiling Design: Designed to Support a Liner Panel Ceiling <br /> Purlin Blocking: Both Endwalls are purlin blocked <br /> Type Foundation:In Ground <br /> Concrete Floor:Yes-Supplied by Purchaser <br /> 30 psf Ground Snow Load with 2"x4"Continuous 2'0" inch on center purlins. <br /> Exterior Finishes: • <br /> Roof/Siding:Grand Rib 3 Plus <br /> - Lifetime Film Integrity Warranty, 35 Year Fade and Chalk Warranty,and;.G-90 Galvanizing Up to 1.0 dunce of Zinc <br /> •Protection. <br /> Wainscot:Grand Rib 3 Plus <br /> Accessories: <br /> • <br /> Standard Ridge Cap for venting the entire ridge. • <br /> Marco LP2 Weather-Tite Ridge Vent"Low Profile" (Add ventilation to ridge). <br /> Side Wall Overhang:12" Aluminum soffit(Sidewall)with vented soffit on S1 &S2 <br /> OSB air deflector at the eaves to protect blown in ceiling insulation <br /> End Wall Overhang:12"Aluminum soffit(Endwall)with vented soffit on El &E2 <br /> v6/11 built with pride before the is applied <br /> �� lof4 <br />