|
Help
|
About
|
Sign Out
Home
Browse
Search
TIE 40809290000 (2)
DaneCounty-Planning
>
Tie Sheets
>
SCANNED & INDEXED
>
TIE SHEETS
>
TIE 40809290000 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2018 1:17:37 PM
Creation date
2/19/2018 2:27:24 PM
Metadata
Fields
Template:
Planning Records
Document_Type
Tie Sheets
Name
TIE40809290000
Municipality
Westport Township
Township_Number
08
Range
09
Section
29
Surveyor's_Name
Badtke, Christopher
Corner_Number
40809290000
Date
1/9/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
U . S. PUBLIC LAND SURVEY MONUMENT RECORD <br /> INSTRUCTIONS : This record shall show the location of the corner and shall include all <br /> of the following nine elements (a through I ) <br /> (a)Identify the corner by reference <br /> to the U. S. public land survey <br /> system. <br /> • = Corner Monument • <br /> NORTHEAST CORNER, <br /> SECTION 32, T 8 N, R 9 E, <br /> TOWN OF WESTPORT, <br /> DANE COUNTY, WISCONSIN. <br /> 32 <br /> (b)Describe any record evidence, monument evidence, occupational evidence, testimonial evidence or any other <br /> material evidence you considered, and whether the monument was found or placed. <br /> FOUND A 2" IRON PIPE AT THE SECTION CORNER LOCATION. THE ALUMINUM MONUMENT <br /> OF RECORD WAS NOT FOUND, BUT A 2" IRON PIPE WAS FOUND TO THE EAST AS A <br /> TIE, PER A MONUMENT RECORD BY HARRY BRIDWELL, DATED OCTOBER 18, 1973 AND A <br /> MONUMENT RECORD BY KEVIN M. RADEL, DATED DECEMBER 22, 1987. THE 2" IRON <br /> PIPE FOUND AT THE SECTION CORNER LOCATION CHECKS WITH THE VIERBICHER ALTA <br /> SURVEY, S-188, DATED JUNE 30, 2008 AND FILED AS 2008-00578 AND ALSO <br /> CHECKS WITH THE SECTION CORNER LOCATION ON THE R/W PLAT PROJECT <br /> 5954-02-01, PREPARED BY AYRES ASSOCIATES ON SEPTEMBER 8, 2005. <br /> I ACCEPTED THE LOCATION OF THE 2" IRON PIPE AS THE SECTION CORNER AND USED <br /> THE FOUND PIPES AND ROD AS TIES ALONG WITH TWO ADDITIONAL TIES SET AS <br /> SHOWN BELOW. <br /> (c) In the plan view drawing below, provide reference ties to at least 4 witness monuments. Witness monuments <br /> shall be made of concrete, natural stone, iron or other equally durable material. Describe witness monuments. <br /> (d) Show a plan view drawing depicting the <br /> relevant monuments and reference ties which <br /> is sufficient in detail to enable accurate <br /> relocation of the corner monument if the <br /> corner monument is disturbed. Indicate north. <br /> LEGEND <br /> 2' <br /> STATE PARK 0 FOUND 2" IRON PIPE <br /> .� SIGN <br /> -�25 OO FOUND 1" 0 IRON PIPE <br /> • • FOUND 3/4" 0 ROD <br /> NORTHEAST <br /> dry/ CORNER SET 3/4" 0 X 18" ROD <br /> / SECTION 32 SIGN <br /> WIRE FENCE o —_78 9_9___� - METAL <br /> X � _� <br /> 79.22' R/W POST UTILITY POLE <br /> 0.73' /\ 35. ( ) "RECORDED AS" INFORMATION <br /> / ,1' <br /> / 24.74' <br /> (24.90) <br /> 46t / (25.00) N <br /> • <br /> i <br /> / p E <br /> / r <br /> PAVEMENT NOT TO SCALE <br /> 2' EDGES H O c t9 1 q <br /> 0000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.