|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2018-00013
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2018
>
DCPZP-2018-00013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2018 1:12:03 PM
Creation date
2/19/2018 3:19:25 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2018-00013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Town of Primrose <br /> Building Permit Approval Checklist <br /> In order to obtain a Building Permit from the Building Inspector that is currently <br /> employed by the Town, you will need to obtain a Building Permit Approval Form <br /> from the Town Board, and a Zoning Permit from Dane County. Other <br /> documents may be required, depending on your project. The following checklist <br /> may be helpful: <br /> 1. Have you reviewed the Town of Primrose Land Use Plan? <br /> 2. Do you know what category your building falls into (residence, agricultural <br /> building, accessory building)? <br /> 3. If this is a residence, are you sure that the current density study allows <br /> this development on your parcel? <br /> 4. Do you know setback requirements from the roadway and lot lines for the <br /> building? <br /> 5. Do you have site plan drawings? <br /> 6. Do you have building elevation drawings? <br /> 7. Have you staked out the building, and the driveway (if one is required)? <br /> 8. Have you called the Town Clerk and asked to be put on the next Planning <br /> Commission Agenda, so that your site plan can be reviewed? <br /> After the review and site visit by the Planning Commission, the following list <br /> applies: <br /> 9. Have you asked the Town Clerk to put your project on the agenda of the <br /> next Town Board meeting? <br /> 10.Have you completed a Zoning Permit Application and set it in with the <br /> appropriate fees? <br /> 11.If this is a residence, have you applied for a Sanitary Permit with Dane <br /> County? <br /> 12.Does construction of your building require you to obtain an Erosion <br /> Control Permit from Dane County? <br /> Once the Town Board of Supervisors approves your plans, the Clerk will notify <br /> the Building Inspector that he/she is clear to issue you a Building Permit, and <br /> will send in a Town Action Report to Dane County Planning and Zoning, <br /> indicating the vote of both the Planning Commission and the Board of <br /> Supervisors. <br /> You can use the same drawings that you present to the Planning Commission, <br /> the Board of Supervisors, and Dane County Planning and Zoning. The process <br /> of obtaining your Zoning Permit from the County can be done concurrently with <br /> the Planning Commission -Town Board review. <br /> September 2015 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.