|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2018-00034
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2018
>
DCPZP-2018-00034
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2018 1:11:59 PM
Creation date
2/20/2018 11:42:41 AM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2018-00034
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CONSTRUCTION BULLETIN <br /> CB 1 <br /> Project Golden Oil-Pleasant Springsi EL <br /> Project No. 1723860 1RCHITECTS•ENGINEERS•SURVEYORS <br /> Location Pleasant Springs, WI <br /> Date January 5, 2018 <br /> This construction bulletin to the contract documents is issued to modify, explain or <br /> correct the original documents and is hereby made part of the construction documents. <br /> All contractors shall read and become familiar with all items in this construction bulletin. <br /> Provide pricing for approval if revisions result in an adjustment to the contract amount <br /> C1.0 • Revised Pavement Sections per Geotech Report <br /> C1.2 • Added additional directional signs & stop signs around site <br /> • Revised pavement section locations on site. <br /> • Added additional concrete for exiting drive through in <br /> emergency <br /> • Added additional concrete in drive through <br /> • Added mountable curb at drive through emergency exit. <br /> • Added mountable curb & concrete at end of entrance island. <br /> • Updated DOT guard rail length from 162' to 142' based on new <br /> dumpster enclosure <br /> • Updated dumpster enclosure area <br /> END OF CONSTRUCTION BULLETIN <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.