|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-2017-02405
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
2010s
>
2017
>
DCPCUP-2017-02405
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2021 3:42:14 PM
Creation date
3/1/2018 10:11:16 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
02405
Town
Cottage Grove Township
AccelaLink
DCPCUP-2017-02405
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
IOWN OF COCIAG6 GROVE <br />TOWN BOARD MEETING <br />SFll LUMBER, G; 2015 <br />able d wood quality As well as property values. They ind"" tMy earn he" eun'ent. <br />operations Gom iheirhome. They had obtained a ropy of the existing alter; erosion <br />and srotmwater control plan from Dane County, but were unclear as to who enforces <br />it Moment also contacted the DNR mid leaned That the operation is missing it <br />essatV Industrial dor mater permit, and dmdmi ed au air quality permit is also <br />neWd ifanycrnshingisperfomiedonaim. They suggested that iffieopmamra <br />holmot be trusted to follow the rules for tire existing site, tow emir they be misted to <br />low them wilt air expansion? <br />• Alex Tuldendorf, 2292 US highway 12 &I8, provided pitons offering violations to <br />operating hours of the existing she since the May Plan Commission meeting, <br />Including some of the gate apse a1W hours and diiss generated by cock oaffic. <br />• dim Meoitt, 1290 North Sam Road, alleged that We quarry operators have a News y of <br />disregard for the environment, and said it is the Towu➢oard's responsibility to <br />entries the recommendation of the Plan Commission to deny the expansion, which <br />could be desmatmingto future development in the vicinity. <br />• Otto K. Oresrn, 2M None board, said the quary has been active them his whole fife <br />and bntmrs notes Gain it all the time, Alhoughmoie now then ever before. He <br />suggested that the operators could show good faith by mdaiming porfious of it, mid <br />wondered if they could he forced to reclaim some of it before being allowed to From <br />up any more. <br />Anders asked Mr. CateeP a series of questions <br />Q: Dallac °berm ": A'. 10 foot minimum blight, seeded. or mulched, <br />Q: Will the site be a "borrow site "'for storage of redute materials" A: These <br />would be no reason for that to acme, odor [m drebac ltion dirt. <br />Qi Hz iwnimyamswoNdbeopmatarymcthne'1 A: 213offirmM res <br />would lie stripped and surrounded by a born at a time, moving north to soot on <br />the site. <br />• Williams was concerned whether a 3- whebmbed win fence would be emugh to <br />keep oar curiousctifdren. <br />MOTIONby Anderstoapprovedaec ifi0 iisepermitforfiveyearsbegmaingm <br />poultry I, 2016 I allow non smooths mining on 35 acres with the following traditions: <br />• No more than 10.ues oftim"pension area may be open at any me time, and for <br />cads also tamest, an am most be leclabncd on the existing site, and seeded with <br />some typo ofground cover. <br />• All open areas must be completely surrounded by IV berm and 3. sound barland who <br />fence. <br />• The con a 35 acme shelf out by used ass borrow pit or albwed to byroad for storage <br />of off sire materials including gravel, areamete or blapkmp. It would be acceptable l <br />bring in dirt for building a bairn. <br />Hours of operation limited to am to b p.m. Monday tiro Friday, and ] a.m. to 4 <br />Inner on op to five Saturdays par ealeadaryeagwith prior notice given to neighbors, <br />No operations on Sundays. <br />Paget of <br />Ainonment 7, P &k <br />
The URL can be used to link to this page
Your browser does not support the video tag.