|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-2017-02405
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
2010s
>
2017
>
DCPCUP-2017-02405
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2021 3:42:14 PM
Creation date
3/1/2018 10:11:16 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
02405
Town
Cottage Grove Township
AccelaLink
DCPCUP-2017-02405
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�¢Y Dave County Zoning Division <br />C;mSm,nm B ... Hag <br />2 1 2 10 Okra r K1,1k, ic, 13,I, Room nn <br />if A <br />Nhei e 3403 <br />ti - tt OUG 266 TVA/66 HfOJ Ps i(Ag Orb 1540 <br />DANE COUNTY <br />CONDITIONAL USE PERMIT #2175 <br />THE ZONING AND LAND REGULATION COMMITTEE OF THE DANE COUNTY <br />BOARD PURSUANT TO SECTION 10 255(2) OF THE DANE COUNTY CODE OF <br />ORDINANCES DOES HEREBY. <br />GRANT Conditional Use Permit #2175 for a concrete batch plant pursuant to Dane <br />County Code of Ordinance Sections 10.12e(3)(a). and subject to any conditions <br />contained herein. <br />EFFECTIVE DATE OF PERMIT: JULY12,2011 <br />THE CONDITIONAL USE SHALL BE LOCATED ON THE PROPERTY DESCRIBED AS <br />FOLLOWS.- 2272 US Highway 12118, Town of Cottage Grove, Dane County <br />LEGAL DESCRIPTION'. <br />Part of the E 112 HE 114 and W 1/2 NW 1/4 Section 34, Town of Cottage Grove <br />described as follows: Commencing at the Northwest corner of HE 1/4 of said Section <br />then South 773 04 feet, thence West 670 feet thence South 950 feet to the point of <br />beginning. Beginning at this point, the 2 acre plant site shall be described as thence <br />North 200 feel, thence East 425. thence South 200', thence West 425, back to the point <br />of beginning and containing the 2 acres, being part of Section No 34. <br />Tax Parcel # 0711 - OUT 8600 -0 <br />COMMONS: <br />1. The applloanl shall submit an erasion uonlml plan covering the entire CUP area for the <br />duration of operations. <br />2. The applicant shall apply far and receive all other souired local. state and federal permits. <br />S. Drum .ofoperation shall be from 600a.m.to6:00 pm. Monday through Friday, and some <br />Saturdays when necessary from 6.00 a.m. to 4dO Fm. Operation outside of those times <br />will require at least? days notice to the Town and Immediate neighbors, and shall be <br />limited to no more than 6 projects not to award 30 total days l year <br />4. CUP 2175 shall not became effediveuntil a prefer harcomrsoctom for state bunk highway <br />has been issued from the Wisconsin Deparlmant of Transportation OehsDYD and <br />operations may not begin until all Improvements, as defined In the permit forcronneetior to <br />Mate seek highway, have been completed <br />5. The operator shall refire all trucks and excavation equipment to have muffler systems: <br />that meet or exceed then current industry standards for noise abatement. <br />Arc,lmmt 0 pg.4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.