|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-2017-02405
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
2010s
>
2017
>
DCPCUP-2017-02405
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2021 3:42:14 PM
Creation date
3/1/2018 10:11:16 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
02405
Town
Cottage Grove Township
AccelaLink
DCPCUP-2017-02405
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Roger W. Lane <br />Nobemhcr10,2019 <br />Paget Pines Bach LIT <br />and state thatosplmit access path and gravel - based, opal at ion at PA beymui <br />mininmin xegvi rents "arils'on formaise wi th tracking, worth arrents." Yetthe <br />permltriamo lug the control and etnnnwamrmovagerneirtplmuaqubed the <br />site to lave a stone backing �pad "a minimum of hU' long x 24' wide and 12" deep and <br />be eons, rated of.'tinch char semis" Pedal 11. The permit fn viler specified drat the <br />mine site may only he accessed from U.S. Hlghway12 using the 'mistlng grovel Hoe <br />and srono hacking pad" <br />fluid, you address "a claim thata portion of Hie quarry ueedsmber lalmed "You <br />adnot that Ihu operations plan shows that the aerially portion of the site is m be <br />worked bctwoeii piker 2014 but state that the operator la permitted m mine Has area <br />until it is exhaustel and .is rut required to lealaini lre area until this time. Yetthe <br />erosion conrol andstormwater management plan provides; in part <br />d. Phasing, <br />`file site will essential py] have two plavyes. Phase 1 will be the rumored mining <br />of the mallo sir 25 acres until 2009 wlmul redirection will take place. Phase 2 will <br />include the tribulation of phase 1 and the commuted mining the souHiermhaff of <br />the propony. <br />I. Revegetati0n Had <br />The revegutatiorr will be hoplemeuted in two contacts. The first phasaof <br />reclamation will take older in OIL fall of 2009. The northern half of the mine will <br />be reclaimed with the construction and cording of the selection pond and all <br />`other lands surrounding the pond. All other areas son 'ouni ing [tire] pond will <br />Lie veclaimed back to agricultural land and planted with a cover crop of winter <br />wheat until other agrbcultuml¢ops such as cam and sroybeuns will be planted <br />The paid will be panted with a no live wet to mrst m;xmre and a cover crap of <br />normal rye. <br />v. Indian Reclamation <br />As stated previously in "d. Phasing," the.si,e will be mined in two plaaseswith <br />the iri'lematon of the brat phase hiking place before mining of phase tva. <br />A lKdment+4, PM9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.