|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2018-00075
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2018
>
DCPZP-2018-00075
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2018 1:10:19 PM
Creation date
3/15/2018 2:17:56 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2018-00075
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A location survey, by a licensed surveyor, is required if your construction <br /> is within 10 feet of a setback line. <br /> • You will need to hire a surveyor to prepare a location survey to verify the construction location. <br /> • The survey shall be done at the time when foundations or basement walls are completed. <br /> • A location survey shall be submitted to the zoning office before continuing work on the project. <br /> • Note: A location survey may add significant cost to your project. Please contact a Wisconsin Licensed Land Surveyor. <br /> you may need this if . . . <br /> 33' 33' <br /> • Front Setback area S 72°57' 40" E 254.01' Side Setback area <br /> • R ear <br /> // / / Setba ck <br /> ck <br /> O <br /> ! O <br /> O /' <br /> 10 Feet / F M <br /> O � ____..___ Needs a W <br /> Location f <br /> Q 1 tU W 0 y3 <br /> 0 Survey Setback W i <br /> e / Line <br /> OO / ' Proposed 169.8' %i� F o0 <br /> CC N O Addition J O <br /> a 35. � is <br /> O —, N <br /> O N <br /> c <br /> r <br /> co 1z co <br /> #c&J J .46 <br /> Side Setback area <br /> N 72°57' 40" W <br /> 33' 33' <br /> 1. I,the undersigned, hereby make application for a zoning permit only for the location and the work described herein and <br /> certify to the accuracy of that information. I further certify I am the property owner, or a duly authorized representative, <br /> and may sign this permit application on behalf of the owner(s)of said property, and I have read and understand all of <br /> the conditions of this permit and will construct the project in compliance with those conditions. I understand that failure <br /> to provide accurate information or to comply with any provisions of the permit renders it null and void and may result in an <br /> enforcement action. <br /> 2. I,the undersigned, hereby consent to the entry on the permitted premises by zoning inspectors of the Dane County <br /> Department of Planning & Development to determine compliance with the county's zoning ordinances.This consent is <br /> valid for the period commencing with issuance of this zoning permit and terminating with issuance of a certificate of <br /> compliance or until earlier revoked in writing by the owner of the property. <br /> PRINT: Owner/Agent DATE: <br /> J ' 5,4 ys 3/ l 31 1 g <br /> SIGNATURE: Owner/Agent <br /> III , <br /> I j ry.,.,40.., <br />
The URL can be used to link to this page
Your browser does not support the video tag.