|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2018-00074
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2018
>
DCPZP-2018-00074
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2018 1:10:23 PM
Creation date
3/15/2018 2:30:15 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2018-00074
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Dane County Water Resource Engineering Division <br /> DINAP - "Do I NEED A PERMIT" <br /> General Information: <br /> Date of Contact: 3/12/2018 <br /> Caller/Contact: Dave Budden- Meigs Inc Phone#: (606) 767-4622 <br /> Landowner: Gregory Baker Phone#: <br /> Contact Email: Dave @meigsbuilds.com <br /> Project Address: 9514 Blackberry Rd <br /> Location(Municipality): Tn. Black Earth Section: 25 'Y: <br /> Parcel#: 0806-251-8400-0 <br /> Project Description: New detached 30' x 50' building, west of existing house <br /> Planned Size of Disturbance: ? ft2 Planned Size of New Impervious: ? ft2 <br /> Water Resource Engineering Division Response: <br /> Based On Information Above the Project:0 DOES* 19 DOES NOT Require a Permit <br /> Determination Made by: ❑JAN ❑JDB OJAS ❑JAH ❑JRT ❑AJM ❑JRR <br /> Type of Permit Required: Erosion Control ❑Shoreland Erosion Control ❑Stormwater Management <br /> ❑Disturbance >4000 ft2 ❑ Excavate/Fill>400 yds3 ❑ Disturbing 100' of ditch/channel <br /> ❑ 125' Long new access road/driveway ❑ Subdivision Plat/CSM ❑ 20,000 ft2 New Impervious areas <br /> ❑Shoreland Zone Disturbance ❑ Other: <br /> Basis for Determination: No grading or filling, or other disturbance will trigger EC, as <br /> described in email. Any changes to scope or omissions in description will <br /> nullify this determination. <br /> Permit determination is based upon the information provided by caller/landowner on the date of contact. <br /> Changes in project size, scope or location may trigger changes to permit requirements. <br /> It is the responsibility of the owner to ensure all required permits have been obtained prior to commencing work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.