|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2018-00133
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2018
>
DCPZP-2018-00133
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2018 12:34:46 PM
Creation date
4/19/2018 1:35:50 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2018-00133
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
.ir ... <br /> } <br /> i <br /> S <br /> 3 <br /> x <br /> CONDITIONS <br /> Width of driveway: 1 I" feet. i <br /> Center of driveway from property line: 7 7 feet. <br /> . <br /> No drainage culvert needed APPRvPRIA7E' LP-AZtl} To tfeem 4T6 543°44143 T <br /> v Drainage culvert Size: Length: Diameter: /5// <br /> * WisDOT Approved apron endwalls are also required. i <br /> t <br /> If this.TLequest is for an additional access: t <br /> • Propert a in acres: t <br /> • Total road fron .:: . the road from which the pro i s . access would serve the parcel <br /> i <br /> • Measurement between centerlines of P'- - 4 g and proposed accesses in feet F <br /> I <br /> • Distance from the side s- •c s of the property <br /> • Zoning classific: '. of the subject property <br /> Numbe . feet from intersections of any town/town or town/county F <br /> ro• <br /> € <br /> i <br /> i <br /> i <br /> Other Requirements: i <br /> 1. Finished accesses must remain at, or below, the grade of the roadway edge for a <br /> minimum of ten feet. <br /> 2. A driveway may consist of concrete, gravel, or asphalt. The first (10) ten feet of <br /> driveway from the edge of the road inward may not be concrete, it must be gravel or $ <br /> asphalt from property to the edge of the road (hereinafter referred to as "Driveway i <br /> Concrete Setback") i <br /> 3. The "Driveway Concrete Setback"shall not be constructed of concrete.The"Driveway t <br /> Concrete Setback" must be constructed using gravel or asphalt. In the event that the <br /> property owner violates the Concrete Driveway Setback requirement and concrete is so <br /> installed, it will be removed and the cost thereof charged against the deposit; of if no <br /> deposit, against the property in violation of the ordinance. <br /> 4. In the event that Property owner violates the Concrete Driveway Setback requirement, i <br /> Property owner hereby agrees to defend and indemnify the Town for any costs or <br /> damages incurred by the Town as a result of the Property owner's violation of the 1 <br /> Concrete Driveway Setback requirement. Property owner further agrees to defend and <br /> hold the Town harmless for any and all damages or costs incurred by Property owner <br /> as a result of the Property owner's violation of the Driveway Concrete Setback $ <br /> requirement. <br /> 5. If a Property owner violates the Driveway Concrete Setback and a Town roadway <br /> improvement project results in a change of grade between the Town roadway and the <br /> 1 <br /> C:i UsersW lbion\Documents\Driveways\DRIVEWAY APPLICATION&PERMIT 1-1-2016.docx 2 1 <br /> 424.06 <br /> i <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.