|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2018-00233
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2018
>
DCPZP-2018-00233
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2019 9:21:17 AM
Creation date
7/3/2018 1:26:24 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2018-00233
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Subsurface Exploration and Foundation Evaluation <br /> Proposed Golden Oil Refueling Station <br /> • Stoughton, Wisconsin <br /> PSI Project No. 0092822 <br /> Page 7 <br /> conjunction with the use of a geotextile fabric. Lime and fly ash modification are two additional <br /> remedial measures which can be considered. However, this must only be performed at the <br /> direction and under the supervision of the geotechnical engineer. A proper mix design must <br /> be performed prior to the performance of any modification. Substantial construction delays <br /> and difficulty with subgrade stabilization should be expected during periods of wet and/or cool <br /> weather. Consideration should be given to installing construction roads to reduce disturbance <br /> to the sensitive subgrade soils. <br /> Every effort must be made to keep excavations dry. If construction proceeds during wet <br /> weather, some additional overexcavation may be necessary. If weather permits, the soil could <br /> be dried and recompacted. A crushed stone working mat, possibly in conjunction with a <br /> geotextile fabric may also be feasible to help stabilize subgrades. Site grading runoff should <br /> be directed to catch basins, so that the potential for the softening of the foundation and <br /> pavement subgrade soils is reduced. <br /> Where the removal of unsuitable bearing material is performed beneath proposed footings, or <br /> the floor slab the excavation must extend laterally beyond the perimeter of the foundation or <br /> slab for a distance at least equal to the thickness of the fill below the footing bottom. This <br /> general guideline also applies to instances where a raised structural fill pad is constructed to <br /> achieve a bearing elevation greater than existing grades. The influence zone of footing and <br /> slab stresses can be represented as an imaginary 45° line extending downward and outward <br /> from the slab or footing bottom. All fill placed within this zone after cutting to firm soil must be <br /> properly engineered, from the bottom of the cut, up to the floor slab or footing subgrade <br /> elevation. <br /> If site grades are raised in excess of 2 feet, the first lift of new fill must be placed so as to <br /> extend a minimum lateral distance of 5 feet beyond the planned top building pad dimension <br /> (for fills less than 5 feet in thickness), or for a distance equal to at least 1 foot laterally beyond <br /> the top pad dimension for every foot of fill thickness (for fills greater than 5 feet in depth). <br /> Subsequent lifts can then be placed on an approximate 1 H:1 V slope back up to the planned <br /> top perimeter dimension of the pad. Proper moisture control is essential to reduce the amount <br /> of compactive effort necessary to achieve the desired densities. <br /> When a firm and stable subgrade is established, low areas may be raised to planned grades <br /> with properly compacted structural fill. Any new fill should be a clean granular soil, such as <br /> those materials meeting the gradations outlined in Section 209 or 305 of the State of <br /> Wisconsin Standard Specification for Highway and Structure Construction. If fine-grained <br /> soils, such as those with high silt or clay content are used, they should generally be placed <br /> over large open areas, where conditions are more favorable for the proper placement and <br /> compaction of such materials. It must be recognized that high silt or clay content materials are <br /> difficult to compact when placed at moisture contents beyond a few percent of the optimum <br /> moisture content. In addition, the near surface soils across the site are considered moisture <br /> sensitive; therefore, some difficulty with subgrade preparation should be expected, especially <br /> if they become wet during construction. Fill must be placed in layers of not more than nine (9) <br /> inches in thickness, at moisture contents at or near optimum, and be compacted to a minimum <br /> density of 95 percent of the maximum dry density as determined by ASTM designation D-698 <br /> (Standard Proctor). Silt, clay, and wet granular soils are not suitable for reuse as compacted <br />
The URL can be used to link to this page
Your browser does not support the video tag.