Laserfiche WebLink
Intertek � 6j SOIL BORING LOG: B - 2 <br /> Project: Golden Oil-Pleasant Springs Project No.: 0092822 <br /> Drill Date: July 17,2017 <br /> Location: Stoughton,Wisconsin Drilled by: Shawn <br /> Logged by: Josh <br /> DEPTH/EL. VISUAL SOIL CLASSIFICATION SAMPLE N Qp Qu MC <br /> REMARKS <br /> (feet) GROUND SURFACE ELEVATION: 875.1 NO. (bpf) (tsf) (tsf) (%) <br /> 3'Black silty CLAY with trace sand and gravel <br /> (TOPSOIL FILL),damp <br /> 1-SS ' <br /> 1 874.1 <br /> 2 - 873.1 - Brown sandy CLAY with gravel(FILL).moist 2-SS 6 12 <br /> 3 872.1 - <br /> ■ <br /> 4 - 871.1 - <br /> 3-SS 9 1 5 21 <br /> 5 - 870.1 Brown silty CLAY,trace sand and gravel(FILL),moist <br /> 6 869.1 <br /> 7 868.1 4-SS 9 12 <br /> ■ <br /> Tan silty SAND,trace gravel,moist <br /> 8 867.1 - <br /> 9 - 866.1_- <br /> 5-SS 22 6 <br /> 10 865.1 <br /> 11 - 8641 <br /> 12 - 863.1 Tan silty SAND with gravel,moist <br /> 13 862.1 <br /> 4_ 861.1_ <br /> 6-SS 32 9 <br /> 15_ 860.1 - <br /> END OF BORING 15 FEET <br /> FIELD OBSERVATIONS: ADDITIONAL COMMENTS: <br /> Water Level d„rr,„admkng. 13±feet below ground surface(EL.862.1±) <br /> Water Level ,o,„p•do„:N/A Y <br /> Caved at„pc,„rq,„p•dp„:8±feet below ground surface(EL.867.1±) <br /> Delay Time N/A - <br /> Water Level d,i,y,d:N/A <br /> Caved at m�rea.N/A <br />