|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2008-00306
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2000s
>
2008
>
DCPZP-2008-00306
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2018 10:42:50 AM
Creation date
7/18/2018 4:09:32 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2008-00306
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> • <br /> Cam, <br /> Dane County Planning and Development Department <br /> . Room 116,City-County Building,Madison,Wisconsin 53703 <br /> Fax (608)267-1540 Community Development <br /> 42406/41. <br /> .? (608)261-9781,Rm.421 <br /> Planning <br /> (608)266-4251,Rm. 116 <br /> July 2007 <br /> Records&Support <br /> (608)266-4251,Rm.116 <br /> Zoning <br /> ZONING PERMIT INSPECTION REQUIREMENTS (608)266-4266,Rm. 116 <br /> The Dane County Zoning Ordinance provides that two inspections shall be made by the Zoning <br /> Department. Instructions are as follows: <br /> The permit card shall be posted on the premises before any earth disturbing activity is started. <br /> 2. The owner or his agent shall have all lot corners visibly staked prior to requesting an <br /> inspection. The Zoning Inspector shall not be responsible for determining the location of lot <br /> lines. Please be advised that zoning inspections are made in reliance upon your correct <br /> identification of property boundaries and lot lines. <br /> 3. FIRST INSPECTION: <br /> a. Is a location survey required? No If yes, a first inspection phone call request <br /> is not regiifr d 3-� <br /> •. U.= owner or ._ent shall the fir pection when the foundation or <br /> bas:, ent ' alls h, e b3en cons -.. Footings onl, are not co _ -4 <br /> fo :. on. <br /> 4. SECOND INSPECTION: Shall be requested when the building is substantially completed. <br /> Interior trim, carpeting, painting, etc., do not have to be finished prior to the inspection but, <br /> interior walls must be in place and the electrical, plumbing and heating services must be— <br /> installed and operating. /0/ 67 ,t 1 E•U/., F—/A3 4 C✓ 4 S- L7 / L 7 <br /> SET ,4C,( a Fr/U/ S/-f64) i,j4cC <br /> 5. CERTIFICATE OF COMPLIANCE: The zoning inspections are made to verify <br /> compliance with the regulations of the zoning ordinance. The Zoning Division upon <br /> completion of the second inspection will issue a certificate of compliance. <br /> To schedule an inspection, call 266-4266, Monday through Friday, 7:45 AM - 4:30 PM. Please <br /> give the permit number and the town that it is located in. You will be given an <br /> inspection request number,which will serve as a verification of your call. <br /> IMPORTANT: The two inspections required by the Zoning Ordinance can only be made by the <br /> Zoning Department. <br /> ** TOWN PERMITS: For information regarding Town permits, contact <br /> /d�/,-) /-{ at 2 55 -4 219 <br /> S:\PIanDev\Zoning\ZLR\Forms,Applications&Informational Materials\ZONING PERMIT INSPECTION RQMTS.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.