Laserfiche WebLink
7. The plan includes a construction schedule as follows: <br /> Grading and construction is planned to begin May 15, 2008. <br /> All disturbed areas on the site must be permanently seeded and mulched or <br /> covered with stone by September 15, 2008. <br /> The construction site must follow the plan according to the schedule approved by Dane County <br /> Land Conservation. This permit will expire on the stabilization date included in the plan <br /> (September 15,2008)and may be amended prior to permit expiration only. This review is <br /> for the erosion control and stormwater management requirements of Chapter 14, Dane County <br /> Code of Ordinances only and other approvals may be necessary. The applicant must obtain a <br /> permit card from the Land Conservation counter and display it on the site prior to <br /> disturbing ground. It is recommended that you contact the Land Conservation Division prior to <br /> picking up the permit card. <br /> Cc: Steve Grant, P.E., R.S. Grant Consulting, Inc. (by email) <br />