Laserfiche WebLink
of 216.00 feet and a long chord bearing and distance of N57°49'26"E; 176.47 feet to said East line <br /> of the Northwest 1/4; Thence S01°31'38"W, 768.14 feet along said East line to the paint of <br /> beginning. Containing 509,398 square feet, or 11.69 acres. <br /> CONDITIONAL ZONING <br /> Conditional zoning is hereby imposed pursuant to Section 10.101(8) (d) of the Dane <br /> County Code of Ordinances. The rezoned area shall be subject to the following <br /> conditions. <br /> 1. The existing residence shall be removed from the property in accordance <br /> with applicable township regulations and within 90 days of county <br /> issuance of a certificate of compliance for the new residence. <br /> DEED NOTICE REQUIRED <br /> This amendment will be effective if within 90 days of its adoption by Dane County <br /> the owner or owners of the land record the following restriction(s) on said land: <br /> 1. A deed notice document shall be recorded on both lots stating: "Further <br /> residential development or land division is prohibited. The development <br /> rights for the property have been exhausted." <br /> Said restriction(s) shall run in favor of Dane County and the pertinent Town <br /> Board(s) as well as the owners of land within 300 feet of the site. Failure to record <br /> the restriction(s)will cause the rezone to be null and void. A copy of the <br /> recorded document shall be submitted to Dane County Zoning. <br /> CERTIFIED SURVEY REQUIRED <br /> The above listed description/s is/are intended to describe land for which a certified <br /> survey map will be prepared for approval and recorded. Within 90 days of rezoning <br /> approval by Dane County, a final certified survey map that describes the land to be <br /> rezoned shall be prepared in accordance with all applicable provisions of Chapter <br /> 236 Wisconsin Statutes and Chapter 75 Dane County Code of Ordinances, and <br /> submitted to the Dane County Zoning Division. Upon submission of the final certified <br /> survey map, the Zoning and Land Regulation Committee, or its authorized <br /> representative, shall, within 30 days, approve, approve conditionally, or reject the <br /> certified survey map. Failure to submit the final certified survey within the 90 <br /> day period and/or failure to record the survey with the Dane County Register <br /> of Deeds will cause the rezone to be null and void. Two copies of the recorded <br /> survey shall be submitted to Dane County Zoning. <br />