Laserfiche WebLink
7/31/2020 <br /> AN <br /> C L ART <br /> Verona,WI 53593 0220Doc ID:5129820 00731094D250 <br /> BUILDING CORP. Phone:(608)845-9700 <br /> ClearyBuilding.com Fax:(608)845-7070 Cleary/Owner Project Contract - Erected <br /> Purlin Blocking: Both Endwalls are purlin blocked,and @ 48'0";@ 56'0"; <br /> Roofline Wind Bracing <br /> Foundation <br /> Type:In Ground <br /> Concrete Floor:Yes-Supplied by Cleary(Concrete not included unless otherwise noted in writing in the Additional Building <br /> Components section) <br /> Column Anchoring <br /> Side Wall:Anchor Block(standard) <br /> End Wall:Anchor Block(standard) <br /> Corner Columns:Anchor Block(standard) <br /> Column Footing <br /> Side Wall:4"x 14" Precast Footing (Standard) <br /> End Wall:4"x 14" Precast Footing (Standard) <br /> Corner Columns:4"x 14" Precast Footing (Standard) <br /> Roof Finish and Accessories for Building 1 <br /> Exterior Finishes <br /> Roof:Grand Rib 3 Plus <br /> Ventilation <br /> Roof <br /> Ridge Cap <br /> Standard Ridge Cap. <br /> Marco LP2 Weather-Tite Ridge Vent"Low Profile"(Add ventilation to ridge). <br /> Accessories <br /> Roof <br /> Condensation Cnntrnl fnr Building 1:None <br /> Ceiling for Building 1 <br /> Ceiling Region Location:Spans from Bay 1 to Bay 7 <br /> Ceiling Insulation: No Fiberglass Batt Insulation Included <br /> CeilingType: Liner Panel <br /> Ceiling Nailers:None <br /> Ceiling Hatch:Cleary ceiling hatch(Owner Locate with Foreman on Job Site) <br /> Ceiling Perimeter Nailer(Not required with ceiling ladder frame) <br /> A total of 0 cut outs are included in this total project(for electrical/plumbing,etc)in the interior finishes,any additional <br /> cut outs will be an extra charge. <br /> Ceiling Region Location:Spans from Bay 8 to Bay 8 <br /> Ceiling Insulation: No Fiberglass Batt Insulation Included <br /> CeilingType:None <br /> Ceiling Nailers:None <br /> A total of 0 cut outs are included in this total project(for electrical/plumbing, etc) in the interior finishes, any additional <br /> cut outs will be an extra charge. <br /> � <br /> v12/10 built with pride before the CO is applied ® 2 of 22 <br />