|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2021-00248
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2020s
>
2021
>
DCPZP-2021-00248
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2021 10:31:44 AM
Creation date
6/18/2021 12:26:01 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2021-00248
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A location survey, by a licensed surveyor, is required if your construction <br /> is within 10 feet of a setback line. <br /> • You will need to hire a surveyor to prepare a location survey to verify the construction location. <br /> • The survey shall be done at the time when foundations or basement walls are completed. <br /> • A location survey shall be submitted to the zoning office before continuing work on the project. <br /> • Note: A location survey may add significant cost to your project. Please contact a Wisconsin Licensed Land Surveyor. <br /> you may need this if . . . <br /> 33' 33' I <br /> I <br /> Front Setback area S 72°57' 40" E 254.01' Side Setback area <br /> • Rear <br /> j 1"//////////// �ii%/ii.. 1 <br /> area <br /> g is nun: o <br /> a— 10 Feet %��� F N <br /> d =:SSC:: Needs a z <br /> ■ ■■■ e W <br /> 0 / eeee:�see � Location � 2 <br /> W <br /> 4 W / I Ili \ Survey _ ��j��S ntback 1Q S� <br /> O = Propposed -�u�'�. 169.8' <br /> e <br /> �/ CV / Q Addition Li <br /> Ce i� 35. = i� m io <br /> O _�� N <br /> r 03 <br /> Z _ _E� ��!!!�!Ll dl z!!1 JGL!JLll�l1�!l�11�11.JJ <br /> • r4 <br /> Side Setback area N 72° 57' 40" W <br /> 33' 33' I <br /> I <br /> 1. I, the undersigned, hereby make application for a zoning permit only for the location and the work described herein arid <br /> certify to the accuracy of that information. I further certify I am the property owner, or a duly authorized representative, <br /> and may sign this permit application on behalf of the owner(s)of said property, and I have read and understand all of <br /> the conditions of this permit and will construct the project in compliance with those conditions. I understand that failure <br /> to provide accurate information or to comply with any provisions of the permit renders it null and void and may result in an <br /> enforcement action. <br /> 2. I, the undersigned, hereby consent to the entry on the permitted premises by zoning inspectors of the Dane County <br /> Department of Planning & Development to determine compliance with the county's zoning ordinances. This consent is <br /> valid for the period commencing with issuance of this zoning permit and terminating with issuance of a certificate of <br /> compliance or until earlier revoked in writing by the owner of the property. <br /> PRINT: Owner/Agent DATE: <br /> SIGNATURE:` _O' }wner/Agent i a tt <br />
The URL can be used to link to this page
Your browser does not support the video tag.