Laserfiche WebLink
will honor the requests of residents within 500'of the mineral extraction site to either <br /> receive or stop receiving such notices at any time. <br /> (3) Other standards. All blasting on the site must conform with all requirements of SPS 307, <br /> Wisconsin Administrative Code, as amended from time to time,or its successor <br /> administrative code regulations. <br /> (4) Fly rock shall be contained within the permitted mineral extraction area. <br /> b) Fuel storage.All fuel storage must comply with ATCP 93, Wisconsin Administrative Code, including <br /> provisions for secondary spill containment. <br /> c) Mineral extraction at or near groundwater.All excavation equipment, plants, and vehicles shall be <br /> fueled, stored,serviced,and repaired on lands at least 3 feet above the highest water table <br /> elevation to prevent against groundwater contamination from leaks or spills. <br /> d) In the event that a mineral extraction operation will destroy an existing Public Land Survey <br /> Monument,witness monuments must be established in safe locations and a new Monument <br /> Record filed by a Professional Surveyor, prior to excavation and disturbance of the existing <br /> monument. <br /> Conditions Unique to CUP 2511. <br /> 1) Operations shall cease no later than 20 years from the date of CUP approval. <br /> 2) There shall be no blasting, crushing or washing. <br /> 3) There will be no hauling routes—material must be trucked to the existing operation areas and will not <br /> utilize any roads except what is already permissible(crossing Norway Grove School Road) per current <br /> operations. <br /> 4) The operator shall use multi-frequency back-up alarms to minimize disturbance to surrounding <br /> properties, and trucks will be routed to avoid unnecessary back-ups, and there shall be an absolute, <br /> peak noise level of no more than 75 decibels(DbA)as measured from the property line <br /> 5) Trees and other plantings shall be maintained, including necessary watering,to ensure intended <br /> aesthetic and screening purposes. <br /> 6) Operator must update reclamation plan (as required by Chapter 74)so that the extraction area shown <br /> in the operations plan is consistent with that shown in the reclamation plan. <br /> Conditions Required by Town of Vienna. <br /> 1) Madison Sand &Gravel (MSG)will upgrade some of the fencing around the residential property that <br /> borders the site to a 4x4 wire mesh; <br /> 2) MSG will locate wells for the five homes in close proximity to the site,test the wells prior to the start <br /> of operation and test them annually to ensure the safety of the water quality. Homes include: Parcel <br /> 0909-221-8002-0;0909-221-8960-0; 0909-221-8560-4;0909-154-9270-5;0909-154-9210-7. MSG will <br /> pay full cost to repair any of the 5 wells located if one fails. <br /> 3) There will be seventeen 5-gallon bucket trees planted around the property line. <br /> 4) Operation hours will be from 6am to 6pm, Monday-Saturday and no washing,crushing or blasting will <br /> take place. <br /> 5) Ten 5 gallon bucket trees will be added by the wetland on Highway V, along the berm,as a sound <br /> barrier for the house across the road. <br /> I <br /> I <br />