|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2021-00357
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2020s
>
2021
>
DCPZP-2021-00357
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2021 1:43:26 PM
Creation date
7/2/2021 1:06:23 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2021-00357
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A location survey, by a licensed surveyor, is required if your construction <br /> is within 10 feet of a setback line. <br /> • You will need to hire a surveyor to prepare a location survey to verify the construction location. <br /> • The survey shall be done at the time when foundations or basement walls are completed. <br /> • A location survey shall be submitted to the zoning office before continuing work on the project. <br /> • Note: A location survey may add significant cost to your project. Please contact a Wisconsin Licensed Land Surveyor. <br /> you may need this if . . . <br /> 33' i 33' <br /> II <br /> Front Setback area S 72° 57' 40" E 254.01' FSide Setback area <br /> • <br /> 1 • ., Rear <br /> _ /iiiiiiii////%i , , . i: i.�j� 1 Setback <br /> area <br /> Cr <br /> p <br /> G <br /> O <br /> 10 Feet F r) <br /> Q i Needs a W <br /> Location W <br /> QI W , N ` SUrvey •# .Setback <br /> Proposed 169.8' <br /> p / is <br /> o � eis,' N <br /> p <br /> Z <br /> w <br /> � r <br /> 1 //. j//j//j/////////////////////j//j//A N_ — — .!LI�LG000C/[GU[ll ell s!l s11 J11<G!!GG!! <br /> I Side Setback area <br /> N 72° 57' 40" W <br /> 33' 33' I <br /> I <br /> 1. I, the undersigned, hereby make application for a zoning permit only for the location and the work described herein and <br /> certify to the accuracy of that information. I further certify I am the property owner, or a duly authorized representative, <br /> and may sign this permit application on behalf of the owner(s)of said property, and I have read and understand all of <br /> the conditions of this permit and will construct the project in compliance with those conditions. I understand that failure <br /> to provide accurate information or to comply with any provisions of the permit renders it null and void and may result in an <br /> enforcement action. <br /> 2. I, the undersigned, hereby consent to the entry on the permitted premises by zoning inspectors of the Dane County <br /> Department of Planning & Development to determine compliance with the county's zoning ordinances.This consent is <br /> valid for the period commencing with issuance of this zoning permit and terminating with issuance of a certificate of <br /> compliance or until earlier revoked in writing by the owner of the property. <br /> PRINT: Owner/Agent DATE: <br /> c4#1. .. — Z',o)/,49N/ <br /> SIGNATURE Owner/Agent <br />
The URL can be used to link to this page
Your browser does not support the video tag.