|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2021-00381
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2020s
>
2021
>
DCPZP-2021-00381
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2021 11:47:44 AM
Creation date
7/9/2021 11:17:02 AM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2021-00381
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Part B: (To be Completed by Town and forwarded to Town Engineer and Town Building Inspector) <br /> Date: 6 / 23 I 21 Fees Collected:44 00°u Town's Signature: _dus._I /,1- <br /> e_p I510 264c <br /> Part C: (To be Completed by Town Engineer) <br /> Required Pipe Size,Slope and Material from Development Drainage Plans(if available)* <br /> See attached. <br /> Other Comments: <br /> Date: 06 /30 / 2021 Engineer's Signature:_ -11.111/4- <br /> *Where the required pipe size,slope and material has been determined as required by Town Land Division Ordinance,this <br /> information is provided by the Developer's engineer of record.The Town of Middleton is not responsible for the accuracy of the <br /> culvert size computations or issues that may arise due to errors in the information provided. <br /> Required Inspections: (Applicant(Builder or Owner only)to request inspections from Town Engineer.Engineer will <br /> complete the inspections within 4 working days.) <br /> • Before culvert is installed—to confirm culvert is being placed at the grades of the established ditch or to the grades and slopes <br /> required by the approved development plan;and to confirm that the location of the driveway is consistent with the proposed <br /> application. Modifying the existing ditch grades could negatively impact adjacent properties. Upon completion of the <br /> driveway paving,and restoration of the ditch disturbed by construction. <br /> • Owner or applicant are to identify the proposed driveway location on the property with a lath or other means before <br /> calling for this inspection. <br /> • Contractor or Homeowner is required to call for a driveway inspection BEFORE THE CONCRETE IS POURED OR PAVED <br /> WITH ASPHALT. <br /> Notes: <br /> • Contractor to verify if existing street has binder course or final pavement at time of driveway installation.The placement of final <br /> pavement typically adds and additional 1.75"of pavement depth at the roadway edge.Driveways installed adjacent to binder <br /> course pavement shall leave the last 5 feet unpaved abutting the street or construct your driveway with concrete,asphalt, <br /> brick,etc.,to the edge of pavement and then have the last 5 feet removed and replaced at the owner's expense when final <br /> pavement is placed. <br /> • The applicant represents all parties in interest,and that such proposed driveway is for the bona fide purpose of securing <br /> access to the applicant's property and not for the purpose of parking or servicing vehicles,advertising,storage or <br /> merchandising of goods within the dedicated portion of the Town road or street,or for any other purpose. <br />
The URL can be used to link to this page
Your browser does not support the video tag.