|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2021-00380
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2020s
>
2021
>
DCPZP-2021-00380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2021 12:12:08 PM
Creation date
7/9/2021 11:20:54 AM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2021-00380
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
, <br /> A location survey, by a licensed surveyor, is required if your construction <br /> is within 10 feet of a setback line. <br /> • You will need to hire a surveyor to prepare a location survey to verify the construction location. <br /> • The survey shall be done at the time when foundations or basement walls are completed. <br /> • A location survey shall be submitted to the zoning office before continuing work on the project. <br /> • Note: A location survey may add significant cost to your project.Please contact a Wisconsin Licensed Land Surveyor. <br /> you may need this if . . . <br /> 33' 33' I I <br /> I I <br /> Front Setback area S 72°57' 40" E 254.01' r Side Setback area <br /> • .. I1 Rear <br /> O 1 , /������ 1 Setback <br /> %� ��� ////// area <br /> o o <br /> 1 10 Feet % F, <br /> Needs a W <br /> Location <br /> Qrs\ <br /> W ' Survey Ø�...sethack169.8'OProposed N 0 AdditionCC <br /> 35. �� //� <br /> o % � ca <br /> O — %�� N N <br /> co <br /> co1 Z co <br />, _17,ff girJ <br /> di <br /> _ _ <br /> • r <br /> 1 Side Setback area N 72°57'40" W <br /> 33' 33' I I <br /> I <br /> 1. I,the undersigned, hereby make application for a zoning permit only for the location and the work described herein and <br /> certify to the accuracy of that information. I further certify I am the property owner, or a duly authorized representative, <br /> and may sign this permit application on behalf of the owner(s)of said property, and I have read and understand all of <br /> the conditions of this permit and will construct the project in compliance with those conditions. I understand that failure <br /> to provide accurate information or to comply with any provisions of the permit renders it null and void and may result in an <br /> enforcement action. <br /> 2. I,the undersigned, hereby consent to the entry on the permitted premises by zoning inspectors of the Dane County <br /> Department of Planning &Development to determine compliance with the county's zoning ordinances.This consent is <br /> valid for the period commencing with issuance of this zoning permit and terminating with issuance of a certificate of <br /> compliance or until earlier revoked in writing by the owner of the property. <br /> PRINT: Owner/Agent DATE: <br /> Carolyn Levy 06/03/21 <br /> SIGNATURE: Owner/Agent <br /> &waver. . <br />
The URL can be used to link to this page
Your browser does not support the video tag.