|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2021-00385
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2020s
>
2021
>
DCPZP-2021-00385
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2021 10:14:31 AM
Creation date
7/13/2021 10:08:56 AM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2021-00385
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6/30/2021 <br /> CLARY P OVeronaWI Box 930220 LINK,VIRGINIA <br /> , 53593-0220 Doc ID:5129820210630101115 <br /> BUILDING CORP. Phone:(608)845-9700 <br /> ClearyBuilding.com Fax:(608)845-7070 Cleary/Owner Project Contract - Erected <br /> Truss Type �~ <br /> t -2�a TREA:Li; i�,Wir. <br /> "0'SHED :DLUh*I <br /> ,.�L� p . M�.r UR <br /> wC OLE� " / 11 .5' MEAN <br /> Note:Clearance may be reduced by finished floor height. <br /> Roof Pitch: 3/12 <br /> Roof Peak Height: 12' 10" <br /> "A" =Actual Eave Height: 10'4" <br /> "B" =Truss clearance at heel and center: 9'0" <br /> (Truss clearance = 1'-0"less than nominal eave height,in most cases. <br /> 100'#0. If nested purlins are used,truss clearance will be increased by 4".) <br /> Standard Lower Chord Truss (SLC) <br /> Payment Terms <br /> Amount Type Percent Description <br /> $8,000 Down Payment 20% Upon the signing of the contract with CLEARY BUILDING CORP. <br /> $7,600 Subcontract 19% Subcontract <br /> $16,000 Delivery Payment 40% Payment due upon first load of building materials. In the event that <br /> multiple loads of materials are required,due to the size of the building,the <br /> remaining materials will be shipped to the site as needed while the building <br /> is under construction <br /> $4,200 Truss Payment 10% When all trusses are installed on the building. In the event that there is <br /> more than one building on a contract,the truss in place payment is due <br /> upon installing the trusses in one of the buildings. <br /> $4,200 Final Payment 10% Paid upon Completion and such payment to be delivered to the crew <br /> foreman of CLEARY BUILDING CORP. <br /> $40,000 Total Amount 100% <br /> TERMS OF PAYMENT:(1)If Contract Amount is$35,000.00 or less,the terms of payment shall be as provided in the payment <br /> terms section above.(2) If Contract Amount is over$35,000.00,the terms of payment shall be pursuant to the Bank Reference <br /> Form which is made a part of this Contract. <br /> If the Purchaser fails to make a payment when due, Purchaser agrees to pay Cleary,upon demand,a delinquency charge equal <br /> to the lesser of three-quarter percent(.75%),or the highest rate allowed by law,of the delinquent amount per fifteen (15)days, <br /> from the date the delinquent amount is due,until the date it is paid. <br /> Purchaser agrees not to send Seller payments marked"paid in full","without recourse",or similar language. If Purchaser sends <br /> such a payment,Seller may accept it without losing any of Seller's rights under this Contract,and Purchaser will remain <br /> ;2�0 built with pride before the is applied 11 of 18 <br /> m, <br />
The URL can be used to link to this page
Your browser does not support the video tag.