|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2021-00354
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2020s
>
2021
>
DCPZP-2021-00354
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2021 1:52:13 PM
Creation date
7/22/2021 1:01:24 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2021-00354
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DANE COUNTY <br /> PLANNINGQ pEVELOPMENT <br /> Dane County Zoning Permit <br /> A Zoning Permit is required prior to obtaining a Town Building Permit. Permits from other regulatory <br /> agencies such as Dane County Land Conservation, Environmental Health, Highway Department, and/or State <br /> Department of Transportation may be needed prior to a Zoning Permit being issued. <br /> Zoning permits are required for new construction, any new building over 120 square feet, <br /> or any modifications or alterations of existing structures. A permit would also be required if you are <br /> changing the use of any existing building on the property. <br /> A permit may be obtained by either coming into our office directly or by mailing in all appropriate information <br /> and fees to Dane County Planning and Development,Zoning Division,City County Building,Rm 116,210 <br /> Martin Luther King,Jr.,Blvd.,Madison,WI 53703-3342.If all required information is available,permits are <br /> generally issued that same day. <br /> REQUIRED ITEMS To Obtain a Zoning Permit: <br />! 1. Site Plan—A scaled drawing showing the lot lines,lot dimensions,location and size of all existing and <br /> proposed structures or additions,and their distances from lot lines. The plan shall include the location <br /> of the on-site septic system if any and the location of the well.If the lot has wetlands or flood plain,the <br /> area may need to be delineated by a Registered Land Surveyor or consultant.The site plan must be <br /> signed and dated by either the owner or agent. <br /> Please Note:Location surveys will be required if you are within 10 feet of any required setback. <br /> See application for explanation. <br /> 2. Building Plans—Floor plans drawn to scale showing all rooms and overall layout. <br /> 3. Elevations—A front elevation is required to show the height of the structure as seen from the property <br /> road frontage. <br /> 4. Required permits/information from other agencies <br /> • Driveway permit from State,County or Town <br /> i. Town roads—contact Town Clerk. <br /> ii. County Highway—contact Christine Walker,(608)283-1486. <br /> iii. State and Federal Highways—contact Scot Hinkle,scot.hinkle%dot.wi.gov,(608) <br /> 246-5334. <br /> • Sanitary permit from Environmental Health(608)242-6515. <br /> i. New homes sites or any building with plumbing <br /> ii. Additions involving bedrooms or major renovations. <br /> • Erosion Control permit from Land Conservation(608)224-3730. <br /> i. Construction within 1000 feet of lake or 300 feet of stream. <br /> ii. Construction of a driveway more than 125 feet long. <br /> iii. Construction involving steep slopes(>12%)or more than 4000 square feet. <br /> 5. Fee -$50.00 base fee and$0.10 per square foot including porches,decks and all basement areas for <br /> residential projects;$250 base fee and$2.00 per$1000.00 of overall cost for commercial/industrial <br /> projects.Additional fees may apply. Fees are payable to Dane County Zoning. <br /> 6. Additional information may be required. <br /> YOUR PERMIT APPLICATION Will be reviewed for: <br /> • Setbacks(front,side,rear);height and actual land use. <br /> • Environmentally sensitive areas(wetlands-floodplain-shoreland). <br /> • Legal parcel status(determination of status may be needed by the Plat Review Officer at 266-4266) <br /> INSPECTIONS REQUIRED: <br /> • FIRST INSPECTION-When the foundation or basement walls have been constructed and before <br /> further construction begins—call 266-4266 or submit location survey if required. <br /> • SECOND INSPECTION- When the building is substantially completed call 266-4266. <br /> • A Certificate of Compliance will be sent to you upon the completion of the second inspection if all <br /> zoning ordinance requirements are met. <br /> QUESTIONS? Please call our office at(608)266-4266 or contact us by email at ZoningACountyofdane.com with <br /> any questions. <br /> REV 01/2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.