Laserfiche WebLink
A location survey, by a licensed surveyor, is required if your construction <br /> is within 10 feet of a setback line. <br /> • You will need to hire a surveyor to prepare a location survey to verify the construction location. <br /> • The survey shall be done at the time when foundations or basement walls are completed. <br /> • A location survey shall be submitted to the zoning office before continuing work on the project. <br /> • Note: A location survey may add significant cost to your project.Please contact a Wisconsin Licensed Land Surveyor. <br /> you may need this if <br /> 33' 33' I I <br /> • <br /> Front Setback area S 72°57'40" E 254.01' FStde Setback area , <br /> Rear <br /> r J.;<„zd_ �_,,,,, 0 1 <br /> area <br /> O O <br /> .0 ' 10 Feet }— M <br /> 0 Needs a <br /> � XXXX ix. Location g <br /> QI w / 1 N Survey 4 setback w <br /> O = Ze=n" <br /> 169.8' / Lfne i- Co <br /> �/ N Add tlon ff�% .� O <br /> A1..4 N 35.0 %i� ] N <br /> ° N <br /> CO <br /> r <br /> 2 _ _ �!//1!/•/!!/.�i C�'Jll!/�!!/�e!/s'!!//II �L/l!/JA <br /> M <br /> • r • <br /> I Slde Setback area N 72°57' 40" W <br /> 33' 33' I I <br /> 1. I, the undersigned,hereby make application for a zoning permit only for the location and the work described herein and <br /> certify to the accuracy of that information.I further certify I am the property owner,or a duly authorized representative, <br /> and may sign this permit application on behalf of the owner(s)of said property,and I have read and understand all of <br /> the conditions of this permit and will construct the project in compliance with those conditions.I understand that failure <br /> to provide accurate information orto comply with any provisions of the permit renders it null and void and may result in an <br /> enforcement action. <br /> 2. I,the undersigned,hereby consent to the entry on the permitted premises by zoning inspectors of the Dane County <br /> Department of Planning&Development to determine compliance with the county's zoning ordinances.This consent is <br /> valid for the period commencing with issuance of this zoning permit and terminating with issuance of a certificate of <br /> compliance or until earlier revoked in writing by the owner of the property. <br /> PRINT: Owner/Agent DATE: <br /> THOMAS TRAUTSCH 7/5/2021 <br /> SUSAN TRAUTSCH <br /> SIGNATURE:� � � <br /> Owner/Aggent/ / <br /> N ..--/ <br />