Laserfiche WebLink
ENGINEER'S PRELIMINARY COST ESTIMATE <br /> PROJECT: Hagey Property ECSP <br /> Erosion Control Improvements <br /> No. of Unit Total <br /> Item Units Units Cost Amount <br /> 1 Fertilize, Seed, and Mulch 333 Sq. Yd. $ 2.50 $ 833 <br /> 2 Erosion Control Mat 725 Sq. Yd. $ 2.50 $ 1,813 <br /> 4 Silt fence 115 Lin. Ft $ 3.00 $ 345 <br /> Subtotal $3,000 <br /> Contingencies (10%) $300 <br /> Estimated Total $3,300 <br /> Note: Estimate includes only the items associated with erosion control and stormwater management. <br /> General Engineering Company Subject: PreliminaryCost Estimate <br /> 111110.110Portage,Gimiri <br /> 53901 <br /> 608-742-21699 t <br /> (Oce) Hagey Property ECSP <br /> www.generalengineering.net Date: 9/5/2019 Engineer: TCF <br /> Engineers•Consultants•Inspectors Sheet: 1 of 1 GEC No.: 2-0715-257 <br />