|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2021-00413
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2020s
>
2021
>
DCPZP-2021-00413
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2021 1:09:48 PM
Creation date
7/30/2021 12:09:33 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2021-00413
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A location survey, by a licensed surveyor, is required if your construction <br /> is within 10 feet of a setback line. <br /> • You will need to hire a surveyor to prepare a location survey to verify the construction location. <br /> • The survey shall be done at the time when foundations or basement walls are completed. <br /> • A location survey shall be submitted to the zoning office before continuing work on the project. <br /> • Note: A location survey may add significant cost to your project. Please contact a Wisconsin Licensed Land Surveyor. <br /> i <br /> you may need this if . . . <br /> 33' 33' <br /> I <br /> SrFront Setback area S 72° 57' 40" E 254.01' r Side Setback area <br /> • Rear <br /> �� ///j/jJi//J/jJ�J/J/��J%j/jam %J/�j I Setback <br /> O /// ///////////////� /ii�/ 1 area <br /> O {rte// // <br /> O <br /> r F� r <br /> Needs a 'o Feet % W <br /> 0 Location W <br /> Q w % W rn <br /> �,\ Survey � --Seiback Q <br /> N ' / Line W <br /> O 0 / = Proposed AN. 169.8 >- co <br /> cc N 0 Addition .a O <br /> iv 35. � _ iN ZD <br /> F-- _ _ _, — . <br /> z co <br /> ‘4_,J J Ai <br /> • N 72° 57' 40" W • <br /> Side Setback area <br /> 33' 33' I <br /> I <br /> ) <br /> 1 1. I, the undersigned, hereby make application for a zoning permit only for the location and the work described herein and <br /> certify to the accuracy of that information. I further certify I am the property owner, or a duly authorized representative, <br /> and may sign this permit application on behalf of the owner(s)of said property, and I have read and understand all of <br /> the conditions of this permit and will construct the project in compliance with those conditions. I understand that failure <br /> to provide accurate information or to comply with any provisions of the permit renders it null and void and may result in an <br /> enforcement action. <br /> 2. I,the undersigned, hereby consent to the entry on the permitted premises by zoning inspectors of the Dane County <br /> Department of Planning& Development to determine compliance with the county's zoning ordinances.This consent is <br /> valid for the period commencing with issuance of this zoning permit and terminating with issuance of a certificate of <br /> compliance or until earlier revoked in writing by the owner of the property. <br /> PRINT: Owner/Agent DATE: <br /> -D41 e 0 44.IA.5oY.\ 1— id —c2/ <br /> SIGN URE: ner/Agent <br /> 1%,z..a.er-7-.--______ <br />
The URL can be used to link to this page
Your browser does not support the video tag.