|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPREZ-2021-11693
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
2020s
>
2021
>
DCPREZ-2021-11693
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2021 9:40:12 AM
Creation date
8/6/2021 9:39:46 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
Rezone
Petition Number
11693
AccelaLink
DCPREZ-2021-11693
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RESOURCE PROTECTION: There are no mapped resource protection corridors on the proposed development site. The <br /> East Branch of Blue Mounds Creek,with associated wetlands and floodplain, is on the western and opposite side of <br /> Cedar Hill Lane. Portions of the proposed RM-8 lot fall within 300 feet of mapped shoreland wetlands. Assistant Zoning <br /> Administrator Hans Hilbert conducted a site inspection of the site and determined that building areas would comply <br /> with shoreland zoning standards. No significant impact anticipated. <br /> STAFF: Recommend approval with no conditions. <br /> TOWN: On April 12,2021,the Town of Vermont Board of Supervisors voted 4-0,with one abstention,to recommend <br /> approval,with no conditions. <br /> Questions? Contact Brian Standing at standinq@countyofdane.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.