|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2021-00448
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2020s
>
2021
>
DCPZP-2021-00448
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2021 11:57:07 AM
Creation date
8/31/2021 11:51:58 AM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2021-00448
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A location survey, by a licensed surveyor, is required if your construction <br /> is within 10 feet of a setback line. <br /> • You will need to hire a surveyor to prepare a location survey to verify the construction location. <br /> • The survey shall be done at the time when foundations or basement walls are completed. <br /> • A location survey shall be submitted to the zoning office before continuing work on the project. <br /> • Note: A location survey may add significant cost to your project.Please contact a Wisconsin Licensed Land Surveyor. <br /> you may need this if . . . <br /> 33' 33' I I <br /> I <br /> 1 Front Setback area S 72° 57' 40" E 254.01' r Side Setback area <br /> 1 + _ �j �j1j • Rear <br /> r7„,,, „„������%�%�%'�� 1 <br /> area <br /> r "4 <br /> O <br /> O O <br /> 1 <br /> r 4/1 10 10 Feet 1— r- <br /> Needs a, / W <br /> !!!!!!! " Location <br /> Q I , N ; ! Survey W <br /> W ` / Setback Q <br /> )-1�/ A�'� N"' Line <br /> O N J <br /> O ProPosetl _ 1 169.8' CO <br /> Addition _I O <br /> Ce iv = j�� r a <br /> .. <br /> I zed <br /> __.Ieiri��LG!�!J:�L�JLiLLJL'LC/!lL ifL iL[L�CLI�CLJJA <br /> • r • <br /> I Side Setback area N 72° 57' 40" W <br /> I <br /> 33' 33' I <br /> 1. I, the undersigned, hereby make application for a zoning permit only for the location and the work described herein and <br /> certify to the accuracy of that information. I further certify I am the property owner,or a duly authorized representative, <br /> and may sign this permit application on behalf of the owner(s)of said property, and I have read and understand all of <br /> the conditions of this permit and will construct the project in compliance with those conditions. I understand that failure <br /> to provide accurate information or to comply with any provisions of the permit renders it null and void and may result in an <br /> enforcement action. <br /> 2. I, the undersigned, hereby consent to the entry on the permitted premises by zoning inspectors of the Dane County <br /> Department of Planning &Development to determine compliance with the county's zoning ordinances.This consent is <br /> valid for the period commencing with issuance of this zoning permit and terminating with issuance of a certificate of <br /> compliance or until earlier revoked in writing by the owner of the property. <br /> PNT: OwnerlAgent DATE: <br /> SIGNAT. ' •.7 0 'rl!gen <br />
The URL can be used to link to this page
Your browser does not support the video tag.