|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2022-00647
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2020s
>
2022
>
DCPZP-2022-00647
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2022 12:56:40 PM
Creation date
11/16/2022 12:56:36 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2022-00647
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. - <br /> ,Art, or 40\� <br /> , y. <br /> d 4 <br /> �, I Dane County Planning & Development <br /> , ����� .� Zoning Division <br /> ZONING PERMIT INSPECTION REQUIREMENTS <br /> The Dane County Zoning Ordinance provides that two inspections shall be made by the Zoning Division. <br /> Instructions are as follows: <br /> 1. The permit card shall be posted on the premises before any earth disturbing activity is started. <br /> 2. The owner or agent shall have all lot corners visibly staked prior to requesting an inspection.The Zoning <br /> Inspector shall not be responsible for determining the location of lot lines. Please be advised that zoning <br /> inspections are made in reliance upon your correct identification of property boundaries and lot lines. <br /> 3. FIRST INSPECTION: <br /> Is a location survey required? No <br /> If yes, a first inspection phone call request is not required. Please arrange to have a copy of the survey <br /> delivered to our department prior to any construction above the foundation. <br /> If no, the owner or agent shall request the first inspection when the foundation or basement walls have <br /> been constructed. Footings only are not considered a foundation. The locational extent of the permitted <br /> structure must be identifiable at the time of the first inspection. Construction may continue only after an <br /> inspection has been requested. <br /> 4. SECOND INSPECTION: Shall be requested when the building is substantially completed. Interior trim, <br /> carpeting, painting, etc., do not have to be finished prior to the inspection but, interior walls must be in place and <br /> the electrical, plumbing and heating services must be installed and operating. <br /> 5. CERTIFICATE OF COMPLIANCE: The zoning inspections are made to verify compliance with the regulations <br /> of the zoning ordinance. The Zoning Division, upon completion of both inspections will issue a certificate of <br /> compliance. <br /> To schedule an inspection, call (608)266-4266, Monday through Friday, 8:00 AM -4:00 PM.You will be given an <br /> inspection request number, which will serve as a verification of your call. <br /> Permit DCPZP-2022-00647 <br /> Number: <br /> IMPORTANT: The two inspections required by the Zoning Ordinance can only be made by the Zoning Department. <br /> **TOWN PERMITS: For information regarding Town permits, contact TOWN OF DUNKIRK <br /> the <br /> Town <br /> at <br /> Building Inspector/Clerk Phone Number <br /> 210 Martin Luther King Jr.Blvd.❑ City-County Bldg,Room 116❑ Madison,WI 53703-3342❑ Phone:608.266.4266❑ Fax 608.267.1540 <br />
The URL can be used to link to this page
Your browser does not support the video tag.