Laserfiche WebLink
10.153(5)(b)2.e.—(5)(b)6. <br /> v. specific relationship to the remainder of the and recommendations on the proposed SIP to <br /> PUD included in the approved GDP, nearby the zoning administrator within 60 days. <br /> properties and existing and planned streets, Alternatively, at the sole discretion of the <br /> highways and other transportation affected town, the town may forward its <br /> improvements; and comments and recommendations to the zoning <br /> vi. a development schedule indicating project administrator prior to the zoning administrator's <br /> stages. determination of SIP submittal completeness, in <br /> e. A written description demonstrating the which case the 60 day review period is not <br /> consistency of the proposed SIP with the required. <br /> approved GDP and the criteria in s. 10.153(4), 4. The planning and development director <br /> and identifying any and all deviations between and zoning administrator shall review the <br /> the approved GDP and the proposed SIP. submitted SIP with reference to the GDP <br /> f. An SIP map at a minimum scale of 1 inch approval, the evaluation criteria in section <br /> equals 100 feet(11" x 17" reduction shall also be 10.153(4), and town comments and <br /> provided) of the proposed project showing at recommendations. Within 50 days of receipt of a <br /> least the following information: complete submittal (of within 10 days of such <br /> i. locations, sizes, dimensions and permitted receipt in the event that the town offers <br /> uses of all lots and building sites (detailed lot comments and recommendations before the <br /> layout/conceptual subdivision plan required for zoning administrator's determination of <br /> SIPs with multiple lots); completeness is made), the director and zoning <br /> ii. locations, sizes and dimensions of all administrator shall determine whether the SIP is <br /> structures (minimum setbacks and yard areas); consistent with the approved GDP. <br /> iii. delineations of all water bodies, wetlands, Inconsistencies shall require an amendment to <br /> floodplains, steep slopes and other sensitive the GDP according to the procedure in sub. <br /> environmental areas; 10.153(5)(a). If generally consistent with the <br /> iv. locations, dimensions and surface type of approved GDP and the evaluation criteria, the <br /> all driveways, walkways, trails, parking and director and zoning administrator shall, within <br /> loading areas and roads; such timeframe, approve the SIP as submitted or <br /> v. detailed off-street- parking lot and stall with modifications necessary to achieve full <br /> design; consistency. If approved with modifications, the <br /> vi. location of all public and private utilities; applicant shall submit modified SIP materials <br /> vii. location, type and intensity of outdoor consistent with the approval before the issuance <br /> lighting; of zoning permits. <br /> viii. location of recreational and open space 5. The approved SIP shall provide the basis <br /> areas and facilities, specifically describing those for the issuance of all subsequent permits <br /> that are to be reserved or dedicated for public including, but not limited to, zoning permits, to <br /> use; and allow development with the SIP area. Any <br /> ix. statistical data on lot sizes in the portion of an approved SIP for which a zoning <br /> development, the exact areas of all development permit is not issued within three years of SIP <br /> lots and pads, density/intensity of various parts approval shall expire, and a new SIP must be <br /> of the development, floor area ratios, and lot submitted and approved for that area before any <br /> coverage percentages. development may occur. <br /> g. A detailed landscaping plan for the area 6. As an alternative to SIP technical review <br /> included in the SIP, specifying the location, by the zoning administrator, planning and <br /> species, and installed and mature size of all development director and affected town, <br /> existing and proposed trees, shrubs and fencing. approval of the GDP may include detailed <br /> h. A signage plan for the project, including restrictive covenants specific to the PUD that <br /> the type, location, height, dimensions, lighting establish a design review committee and design <br /> and sign face area of all proposed signs. review process to review SIP submittals so as to <br /> i. An erosion control, drainage and ensure compliance with the GDP. All other <br /> stormwater management plan. requirements for the SIP per para. (b) above <br /> j. Building elevations for all buildings, shall remain in effect if this option is approved by <br /> including building heights and materials. the town and county as part of the GDP. <br /> 3. After the SIP submittal is complete, it shall [HISTORY: 10.153 cr.,OA 44,2009-10,-pub.02/15/10.] <br /> be forwarded to the town clerk of the affected <br /> town. The town may then forward any comments <br /> Page 10-42 <br /> rev. 073113 <br />