|
Help
|
About
|
Sign Out
Home
Browse
Search
April Dane County Code of Ordinances
DaneCounty-Planning
>
Zoning
>
Dane County Code of Ordinances
>
1990's
>
1998
>
April Dane County Code of Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2022 10:59:09 AM
Creation date
11/18/2022 10:59:00 AM
Metadata
Fields
Template:
Planning Records
Document_Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
;1 u :14lo =14:53(1) <br /> _ __ :;_ -..,�..f :_ sue.:. <br /> (5) Perform other duties as _specified in this (2) LCC staff refers to staff of the land <br /> ordinance. conservation corrimittee• as authorized under s. <br /> 92.09 of the Wisconsin Statutes. <br /> 14.33 INSPECTION AUTHORITY.. The zoning '(3) " Plan means the erosion control plan required <br /> administrator is authorized to enter upon any,lands by sec. 14.53. <br /> • affected by this ordinance in order to inspect such (4) Sensitive areas refers to lakes, perennially <br /> lands prior to or after permit issuance for the flowing streams, or wetlands regulated by Dane <br /> • purpose of "determining compliance with this County. <br /> ordinance. If permission cannot be:received from (5) Soil loss rate means the rate at which soil <br /> the applicant or permittee, entry by the zoning movement :occurs as a result of sheet and rill <br /> administrator shall be according to sections 66.122 erosion and does not apply to ditches or areas of <br /> and 66.123,'Wis.Stats. concentrated flows. <br /> (6) No increase in'surface water drainage means <br /> 14.34 .ENFORCEMENT AUTHORITY. (1), The all calculated post-construction discharges from <br /> zoning administrator is authorized to post an order any regulated site for a two-year and a 10-year <br /> stopping work upon land which has had a permit storm shall .not be greater than pre-construction <br /> revoked or on land currently undergoing activity in peak discharges. Where permanent on-site <br /> violation of this ordinance. Notice is given by both detention is used for runoff control, the detention <br /> posting upon the land where the violation occurs facilities shall'safely contain and/or safely pass the <br /> one or more copies of the poster stating the runoff of a 100-year storm of any duration. - <br /> violation, and by'mailing a copy of the order by (7) ' Site means the'bounded area described in an <br /> certified mail-to-the ,person whose activity is in erosion control plan upon which regulated soil <br /> violation of this ordinance. This order shall specify disturbing activity takes place. <br /> that the activity:must cease or be brought into [History: (4),(5),(6)and(7)cr.,Sub.'4 to OA 27, 1993-94,pub. <br /> 09/30/94,eff:01/01/95.1 <br /> compliance within 30 days. <br /> (2) Any permit revocation or order stopping work 14.52 LEGISLATIVE FINDING. The county board <br /> shall°remain in effect until rescinded by the zoning of supervisors of Dane County finds "that soil <br /> administrator, or a court of general jurisdiction; or erosion from land disturbing activities_ and <br /> until the activity is brought into compliance with <br /> subsequent development can disturb natural cover <br /> the ordinance. The zoning administrator is and land surfaces resulting in a change in runoff <br /> authorized to refer any violation of this ordinance patterns that may have .a detrimental effect on <br /> or of an order stopping work issued pursuant to - water quality and downstream uses; these <br /> this ordinance to the corporation counsel for activities and impacts may cause damage to <br /> commencement of further legal proceedings. adjoining properties that should" be strictly <br /> (14.35- 14.49 reserved for future use.] <br /> " regulated. Further, effective sediment and storm <br /> . water management depends upon proper planning. <br /> SUBCHAPTER II design and timely installation of conservation <br /> EROSION CONTROL SYSTEM practices" as well as continuing maintenance <br /> practices. ' <br /> 14.50 AUTHORITY: Sections 14.50 throw h [History: am., Sub. 4 to OA 2:,,1993-94, pub. 09;30:94, ec. <br /> g 01/01/95.1 <br /> 14.57, inclusive, are created under the authority of - , <br /> sec. 59.693 and sec. 33.455" of. the Wisconsin 14.53 APPLICABILITY OF REQUIREMENT FOR <br /> Statutes. - ' EROSION CONTROL PLANS. ' (1) Any land <br /> [History: am., sub.'4 to OA 27, 1993-94, pub. 09/30/94, eft disturbing activity occurring anywhere within the <br /> 01/01%95;am.,OA 49,1996-97,pub.07/18/97.1 territorial limits of Dane County which involves a,; <br /> • area in excess of 4,000 square feet or involving <br /> . 14.51 DEFINITIONS. As used in sections,-14.52 activity on a slope of greater than 12 6/0 grade <br /> through 14.57, inclusive, the following words have which. -may have oft-site impacts, excluding <br /> the definitions indicated: agricultural activities or government highway. <br /> (1) LCC means the Dane County Land construction, is subject to sections 14.51 through <br /> Conservation Committee created under,sec. 92.06 14.99 of this ordinance to control off-site soil <br /> of the Wisconsin Statutes. transport. This provision shall not apply to <br /> Page 14-4 " <br /> - rev. 073197 <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.