Laserfiche WebLink
• <br /> 10.25(2)—(4) <br /> zoning inspector, the zoning administrator cannot (h) Any permit obtained. through material <br /> determine compliance with the provisions of county misrepresentation shall be null and void. <br /> ordinances, the zoning administrator may require (i) A permit issued pursuant to the provisions of <br /> the filing of a development .plan prepared by a this section shall expire one year from the date of <br /> licensed surveyor. The zoning administrator may issuance if construction is not started within that <br /> also require evidence of compliance with the Dane time and will expire if construction once started <br /> County Sanitary Code, the Dane County Land does not diligently proceed to completion within <br /> Division and Subdivision Ordinance, Dane County two years starting time. <br /> Trunk Highway Access Control Regulations or any (3) inspections of buildings to be made by the <br /> other state or township ,access or culvert permit zoning administrator. (a) 1. A location survey as <br /> requirements as a' condition precedent to the , defined herein shall be submitted to the zoning <br /> issuance of a zoning permit. The zoning division for all construction which will be located <br /> administrator shall not be responsible for less than 10' from required setback lines. The <br /> determining the location of lot lines. survey shall be done at the time when foundations <br /> (d) Application for a permit must contain the or basement walls are completed. Such survey shall <br /> following: name and address of the owner of the be submitted to the zoning office prior to the <br /> property, legal description, size and location of the continuation of work on the project. <br /> building-to be erected or moved on or onto the 2. For construction which is located 10' or more <br /> property, proposed use of the building or premises, from the required setback lines, a location survey is <br /> type of construction, estimated cost and any other not required. The property owner/s and <br /> information as the zoning administrator may contractor/s are responsible for determining location <br /> require. compliance. <br /> (e) This application shall be signed by the owner (b) Upon completion of the project the owner/s <br /> or his or her duly authorized representative or or their agent shall notify the zoning division and <br /> agent; provided, however, that, if a prospective request an inspection. This inspection must be <br /> owner desires 'a prior ruling on a proposed made before a zoning certificate of compliance may <br /> construction or use before consummation of be issued as provided by section 10.25(4) of this <br /> purchase, he or she may apply for a permit, and, if a ' ordinance. The owner or his or her agent shall <br /> permit be denied, he or she may appeal to the have all lot corners visibly staked prior to requesting <br /> board of adjustment. an inspection. If the zoning administrator is unable <br /> (f) Coincident with the issuing of a permit, the to accurately verify the location of a building on its <br /> zoning administrator shall prepare a card certifying lot, he'or she may post a stop work order where <br /> that a permit has been issued. This card shall bear ' appropriate and require that a survey map be <br /> the same number as the permit and identify the prepared by a registered land surveyor that will <br /> construction and premises covered.by the permit. show the location of the building on its lot before <br /> This card shall be posted in a conspicuous place on allowing construction to continue. <br /> the premises during the construction, and no (c) -Stop work order. 1. -Whenever the zoning <br /> construction shall be begun until this card has been , administrator finds that any construction does not <br /> posted. For purposes of this ordinance, start of comply with the provisions of this ordinance, the <br /> construction shall be when any earth disturbing zoning administrator shall post, in a conspicuous <br /> activity takes place that will lead to the installation place on the premises, a stop work order,which <br /> of footings, piers, posts, pilings or foundations. shall cause all activity to cease until the <br /> Earth disturbing activity for the purpose of soil - construction is in compliance with the ordinance. <br /> evaluation or testing shall not be considered the 2. The card .shall provide the following <br /> start of construction. information: date of issuance, town and section <br /> (g) Each,day a non-permitted structure, building, number, reason for posting and the signature of the <br /> addition, alteration or activity exists shall constitute ' inspector posting the card. <br /> a separate violation. A non-permitted structure, 3. It shall be a violation of the ordinance for the <br /> building, addition, alteration or activity is, one unauthorized removal of the card from the <br /> which requires the issuance of a permit under this premises. <br /> ordinance but which permit has not been,issued by (4) Certificate of compliance. (a) No building or <br /> the zoning administrator. addition thereto, constructed after the effective date <br /> of this ordinance and no addition to a previously <br /> existing building shall be occupied, except <br /> Page 10-41 <br /> rev. 103198 <br />