Laserfiche WebLink
10.194(2)-(7) <br /> (2) No conditional use permit for the placement the applicant believes are qualified to assist in <br /> or construction of a tower shall be issued unless the resolving the issues before the committee. <br /> applicant presents to the committee credible (5) In applying the standards and criteria set forth <br /> evidence establishing to a reasonable degree of in section 10.255(2), D. C. Ords., to applications for <br /> certainty the following: conditional use permits for the placement or <br /> (a) No existing communication tower is located construction of a communication tower the <br /> within the area in which the applicant's equipment committee shall, unless it is shown to be <br /> must be located; or " _ unreasonable, condition the grant of the permit <br /> (b) No existing communication tower within the upon the applicant placing or constructing the <br /> area in which the applicant's equipment must be communication tower so as to accommodate, at a <br /> located is of sufficient height to meet applicant's minimum height of 150 feet, the collocation of two <br /> requirements and the deficiency in height cannot be additional antenna arrays similar in size and <br /> remedied at a reasonable cost; or function to that placed on the tower by the <br /> (c) No existing communication tower within the applicant. Collocation sites need not be available <br /> area in which the applicant's equipment must be on the tower as initially placed or constructed, <br /> located has sufficient structural strength to support provided that the tower will support at the specified <br /> applicant's equipment and the deficiency in minimum height the later addition of the required <br /> structural strength cannot be remedied at a number of collocation sites. Notwithstanding the <br /> reasonable cost; or height and number of collocation sites on the tower <br /> (d) The applicant's equipment would cause as initially placed or constructed, the <br /> electromagnetic interference with equipment on the communication tower design approved and <br /> existing communication tower(s) within the area in permitted under this ordinance shall be for a tower <br /> which the applicant's equipment must be located, of 150 feet in height and shall include the required <br /> or the equipment on the existing communication collocation sites. The holder of a permit under this <br /> tower(s) would cause interference with the section shall make the collocation sites required <br /> applicant's equipment and the interference, from hereunder available for the placement of <br /> whatever source, cannot be eliminated at a technologically compatible antenna arrays and <br /> " reasonable cost; or equipment upon contractual provisions which are <br /> (e) The fees, costs or contractual provisions standard in the industry and at prevailing market <br /> required by the owner in order to collocate on an rates allowing the permit holder to recoup the cost <br /> existing communication tower are unreasonable of providing the collocation sites and a fair return <br /> relative to industry norms;or on investment. <br /> (f) The applicant demonstrates that there are (6) Unless otherwise provided herein, a <br /> other factors that render existing communication conditional use permit is required for any <br /> towers unsuitable or unavailable and establishes modification of a communication tower which <br /> that the public interest is best served by the significantly alters the appearance or structural <br /> placement or construction of a new communication integrity of the tower or which involves- the <br /> tower. installation of antenna or equipment differing in <br /> (3) The cost of eliminating impediments to size and function from that previously installed on <br /> collocation shall be deemed reasonable if it does the tower. The committee shall apply the standards <br /> not exceed by 25 percent the cost of constructing a under section 10.255(2), D. C. Ords., when <br /> new tower on w hich to mount applicant's considering an application for a conditional use <br /> equipment. permit to allow the modification of an existing <br /> (4) In the event the committee determines that it communication tower. In addition, the committee <br /> is necessary to consult with a third party in shall consider the reasonableness, based on <br /> considering the factors listed in subsection (2) economic ' and technological feasibility, of <br /> above, all reasonable costs and expenses associated conditioning the grant of the conditional use permit <br /> with such consultation .shall be borne by the upon modifying the tower in a manner which <br /> • applicant. Failure to pay such costs and expenses would accommodate the collocation of one or more <br /> or provide information requested by the committee additional antenna arrays. <br /> shall be grounds for denial or revocation of a (7) Upon written inquiry by the committee the <br /> conditional use permit. The applicant may provide recipient of a conditional use permit under this <br /> to the committee the names of consultants which section shall have the burden of presenting credible <br /> evidence establishing to a reasonable certainty the <br /> Page 10-37 <br /> • <br /> rev. 103198 <br />