|
Help
|
About
|
Sign Out
Home
Browse
Search
Dane County Code Of Ordinances
DaneCounty-Planning
>
Zoning
>
Dane County Code of Ordinances
>
1990's
>
1999
>
Dane County Code Of Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2022 11:21:00 AM
Creation date
11/18/2022 11:20:51 AM
Metadata
Fields
Template:
Planning Records
Document_Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
10:25(2)-(4) <br /> zoning inspector, the zoning administrator cannot (h) Any permit obtained through material <br /> determine compliance with the provisions of county misrepresentation shall be null and void. <br /> ordinances, the zoning administrator may require (i) A permit issued pursuant to the provisions of <br /> the filing of a development plan prepared by a this section shall expire one year from the date of <br /> licensed surveyor. The zoning administrator may issuance if construction is not started within that <br /> • also.require evidence of compliance with the Dane time and will expire if construction once started <br /> County Sanitary Code, the Dane County Land does not diligently proceed to completion within <br /> Division and Subdivision Ordinance, Dane County two years starting time. <br /> Trunk Highway Access Control Regulations-or any (3) Inspections of buildings to be made by the <br /> other state or township access or culvert permit zoning administrator. (a) 1. A location survey as <br /> requirements as a condition precedent to the defined herein shall be submitted to the zoning <br /> issuance of a zoning permit. The zoning division for'all construction which will be located <br /> administrator shall not be responsible for less than 10' from required setback lines. The <br /> determining the location of lot lines. survey shall be done at the time when foundations <br /> (d) Application for a permit must contain the or basement walls are completed. Such survey shall <br /> following: name and address of the owner of the be submitted to the zoning office prior to the <br /> property, legal description, size and location of the continuation of work on the project. <br /> building to be erected or moved on or onto the 2. For construction which is located 10' or more <br /> property, proposed use of the building or premises, from the required setback lines, a location survey is <br /> type of construction, estimated cost and any other not required. The property owner/s and <br /> information as the zoning administrator may contractor/s are responsible for determining location <br /> require. compliance. <br /> (e) This application shall be signed by the owner (b) Upon completion of the project the owner/s <br /> or his or her duly authorized representative or or their agent shall notify the zoning division and <br /> agent; provided, however, that, if a prospective request, an inspection. This inspection must be <br /> owner desires a prior ruling on a proposed made before a zoning certificate of compliance may <br /> construction or use before consummation of be issued as provided by section 10.25(4) of this <br /> r purchase, he or she may apply for a.permit,and, if a . ordinance. The owner or his or her agent shall <br /> permit be denied, he or she may appeal to the have all lot corners visibly staked prior to requesting <br /> board of adjustment. an inspection. If the zoning administrator is unable <br /> i. <br /> (f) Coincident with the issuing of a permit, the to accurately verify the location of a building on its <br /> zoning administrator shall prepare a card certifying lot, he or she may post a stop work order where <br /> that a permit has been issued. This card shall bear appropriate and require that a survey map be <br /> the same number as the permit and identify the prepared by a registered land surveyor that will <br /> construction and premises covered by the permit. show the location of the building on its lot before <br /> This card shall be posted in a conspicuous place on allowing construction to continue. <br /> the premises during the construction, . and no (c) Stop work order. 1. Whenever the zoning <br /> construction shall be begun until this card has been administrator finds that any construction does not <br /> posted. For purposes of this ordinance, start of comply with the provisions of this ordinance, the <br /> construction shall be when any earth disturbing zoning administrator shall post, in a conspicuous <br /> - activity takes place that will lead to the installation place on the premises, a stop work order which <br /> of footings, piers, posts, pilings or foundations. shall cause all activity -to cease until the <br /> Earth disturbing activity for the purpose of soil construction is in compliance with the ordinance. <br /> evaluation or testing shall not be considered the 2. The card shall provide the following <br /> start of construction. information: date of issuance, town and section <br /> (g) Each day a non-permitted structure, building, number, reason for posting and the signature of the <br /> addition, alteration or activity exists shall constitute . inspector posting the card. <br /> a separate violation. A non-permitted structure, 3. It shall be a violation of the ordinance for the <br /> building, addition, alteration or activity is one unauthorized removal of the 'card from the <br /> which requires the issuance of a permit under this premises. <br /> ordinance but which permit has not been issued by (4) Certificate of compliance. (a) No building or <br /> the zoning administrator. addition thereto, constructed after the effective date <br /> of this ordinance and no addition to a previously <br /> existing building shall be occupied, except <br /> Page 10-41 <br /> rev. 103198 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.